Mr. Alan Cohen <br />ftch 20, 2012 <br />( <br />13. Make 'Exotic Planter" a dry planter — no water feature at this location. <br />14. Study and adjust the proximity of the plaza trees to the kids water feature — Avoid leaves <br />from clogging the waterjet system. <br />15. Great lawn shall maintain a constant elevation as originally designed. <br />16. Provide a 30'x60' stage with a 12'x20' back room and stage floor to be 42° above <br />adjacent walkway flooring. — To be designed for a total budget of $500,000.00 <br />17. Provide landscape lighting fixtures with outlets. <br />18. Provide sufficient electrical panel capacity for other park activities and /or functions <br />19. Do not use lemon or fruit trees on park. <br />20. Do not use Sabel palms and make landscaping budget an allowance in order to <br />determine the specific tree species a later time — It is preferred to use a variety of trees <br />similar to Fairchild Garden. <br />21. Provide three (3) flag poles at the northeast corner of the site. <br />22. Slope top of crash wall to avoid kids form walking on surface. <br />23. All three (3) Kids Play Equipment apparatus to remain as originally designed. <br />24. Leave Kids Water Court and the Water Wall. <br />25. Leave the Playground Cover for three apparatus. <br />26.40i Level Banquet Hall and Restaurant will not be included as part of the scope of work. <br />27. Provide a HC restroom for the stage back room. <br />Note: Due to the fact that at this time there is no spit report or structural engineer design, we <br />will maintain a structural slab Inside the storage room. Once we engage In the Design <br />Development Phase and this Issue Is further reviewed we can make a better assessment on <br />what type of slab better suits the project and achieves the target budget. The cost for a non- <br />structural floating slab is estimated at $20.00 SF (Including the fill required to achieve the same <br />level of the building ground floor slab). <br />Please keep in mind that many of these Items are of a technical nature that will be Incorporate in <br />the project documents during the Design Development and Construction Document Phase, <br />therefore they are not reflected on the Site Plan Approval documents at this time. <br />Summary of Total Project Coats <br />Parking Structure Contract = $10,000,000.00 <br />Additional Items to Parking Structure under contract dated 7121111 submitted for <br />approval: <br />Foundation Improvements for 49' Level Construction: $ 490,000.00 <br />Park Improvements (60,000 SF Site) _ $ 3,734,321.00 <br />Pedestrian Bridge and Towers = $ 2,217,941.00 <br />Pertormance btaae = 2 guy. <br />Total a $ 9,942, <br />e e Tinkle credit 2 floors = 100 <br />Ad !sled Total = $ 9,842, <br />Page 2 or 3 <br />NJ <br />