Laserfiche WebLink
INTERNATIONAL GENERAL CONTRACTOR <br />Praia& Gateway Park -Performance Stage Date: 03/21112 <br />Location: City of Sunny Isles Beach, Florida <br />Park Cost Estimate Summary <br />(Incorporates City Requirements of 312112 :3/9/12 and 3115/12) <br />Code <br />No. <br />Item Des lion <br />P <br />Unit s <br />Cost / unit <br />Total <br />Remarks <br />Maanr o..ga.dan <br />2000 <br />SITEWORK <br />Installation - Equip. 8 site related costs <br />1 <br />UN <br />18,000.00 <br />16,000.00 <br />3000 <br />CONCRETE <br />Conc. / Masonry - Stage/Wa11/Backreom 1 <br />UN <br />109,000.00 <br />109,000.00 <br />Inctudaq foundations <br />4000 <br />MASONRY <br />CMU - Included under Concrete <br />000 <br />5000 <br />METALS <br />Primary Support Columns <br />4 <br />UN <br />I 7,000.00 <br />28,000.00 <br />Roof support system - Beams 8 Truss <br />1.800 <br />SF <br />20.00 <br />36,000.00 <br />6000 <br />CARPENTRY / WOOD 8 PLASTIC <br />Included under Concrete <br />000 <br />7000 <br />THERMAL MOISTURE <br />Metal Roofing <br />1,800 <br />SF 1 <br />22.00 <br />39,600.00 <br />8000 <br />DOORS & WINDOWS <br />Not Applicable <br />0.00 <br />9000 <br />FINISHES <br />Stucco - Included under Concrete <br />0 <br />0.00 <br />Paint - Metal/ Stucco <br />1 <br />UN <br />15,000.00 <br />15.000.00 <br />10000 <br />SPECIALTIES <br />Not Applicable <br />0.00 <br />I <br />Not Applicable <br />000 <br />Page 1 of 2 <br />SIB <br />