Laserfiche WebLink
Notes: <br />01- Estimated project costs does not include the following: <br />Land acquisition cost. <br />Sound System Design / Installation / Equipment <br />Testing fees. <br />City / Agency fees. <br />Relocation of existing elect. poles. <br />Upgrades to existing utilities. <br />Environmental related issues and/or work. <br />Demolition of existing structures, utilities, underground constructions, etc. <br />02- Costs are subject to change based on final program, design and /or site conditions, <br />Pape 2 of 2 <br />SIB <br />Park Cost Estimate Summary <br />(Incorporates City Requirements of 3/2112; 3MI12 and 3115112) <br />Code <br />No. <br />Item Description <br />p <br />Unit a <br />at I Unit <br />Total <br />Remarks <br />12000 <br />FURNISHINGS <br />Not Applicable <br />0 <br />13000 <br />SPECIAL CONSTRUCTIONS <br />Not Applicable <br />000 <br />14000 <br />CONVEYING SYSTEMS <br />Not Applicable <br />0.00 <br />15000 <br />MECHANICAL <br />A/C System (Installed) <br />1 <br />UN 1 <br />10,00000 <br />10,000.00 <br />HC Restroom at bacluoom <br />1 <br />UN <br />19,800. .00 <br />19,600.00 <br />Including � terasevar <br />16000 <br />ELECTRICAL <br />Electrical work / Panels <br />1 <br />UN <br />40,000.00 <br />40,000.00 <br />Lighting <br />1 <br />UN 1 <br />60,000.00 <br />60,D00.00 <br />APOwance <br />SUB -TOTAL <br />$375,400.00 <br />Contingency <br />General Conditions <br />Gen. Liability Insurance <br />GC Overhead / Fee <br />$9,385.00 <br />$38,478.50 <br />$5,925.69 <br />$21,459.46 <br />TOTAL HARD COST <br />$450,646.65 <br />AIE 8 Consultants Professional Fees <br />Leper of Credit <br />$45,064.86 <br />$4,957.14 <br />PROJECT TOTAL <br />$500,670.65 <br />ROUNDED PROJECT TOTAL <br />$500,00100 <br />Notes: <br />01- Estimated project costs does not include the following: <br />Land acquisition cost. <br />Sound System Design / Installation / Equipment <br />Testing fees. <br />City / Agency fees. <br />Relocation of existing elect. poles. <br />Upgrades to existing utilities. <br />Environmental related issues and/or work. <br />Demolition of existing structures, utilities, underground constructions, etc. <br />02- Costs are subject to change based on final program, design and /or site conditions, <br />Pape 2 of 2 <br />SIB <br />