My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2013-2040
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2013
>
Reso 2013-2040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2013 11:11:10 AM
Creation date
4/11/2013 10:43:30 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2013-2040
Date (mm/dd/yyyy)
04/09/2013
Description
Approve 3rd Amend/Design-Build Agmt w/ 4M Investors, LLC.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�l <br />GATEWAY PARK GARAGE <br />SHOPPING LIST <br />12/14/12 <br />Listed below are the redesign criteria requested by the city for the Gateway Park Garage. This <br />list is being compiled after an initial meeting that was held between Jaime Eisen, Helen Grey, <br />Eduardo Castineira, and Clay Parker on 12/4/2012: <br />1. New garage design to be divided into two zones with 60' clear each side providing <br />parking spaces 18' deep, parking access drive 24' wide. This will be similar to Heritage <br />design. <br />2. No interior columns (open design), similar to Heritage. <br />3. Ground level height will be 15' slab to slab, to allow the development of usable ground <br />floor space for future facility. Ground level dear height to be from 12' 6' to 14'. <br />4. Additional floors, floor to floor height should be adjusted to maintain a minimum clear <br />headroom height with sprinkler system at 7' 60. <br />5. Enclose approximately 16,000 square feet of ground floor air conditioned space on the <br />South side of parking garage for future facility. <br />6. The South perimeter wall of the parking structure to be designed utilizing a transfer <br />beam to carry the load of the upper floors of the garage, allowing for the open design of <br />the enclosed 16,000 square foot space, all the way to the south wall. <br />7. The South and East perimeter_ walls of the enclosed 16,000 square feet space should <br />utilize as much glass storefront as possible. <br />8. All glazing for the entire project shall utilize impact safety glass to meet the High Wind <br />Zones of the Florida Building Code. <br />9. Exhaust vents and electrical service through ramp area to the north (not to the roof). <br />10. Air Conditioning/Refrigeration Condensers to be placed on the North side of the <br />building. 3-4-H <br />11. walqAaiRclesign for 368 parking spaces as spelled out in the Design -Build agreement <br />12. All handicap parking on ground level. (8 spaces) <br />13. The current design shows the West end of the parking structure at 18' 6' to the <br />property line. The west setback by zoning ordinance is 15'. However, it could be <br />reduced, as needed, for lengthening of parking structure to meet the 6% gra de for <br />parking on ramp. If needed, the West set back could be reduced to a minimum of 10' by <br />variance. <br />14. The previous design located the entrance drives 50' east of the west end of the garage. <br />This was done to support the two future elevators that are not going to be needed and <br />could be moved closer to the west end, giving us the needed additional length to allow <br />for parking ramps. <br />SIB <br />
The URL can be used to link to this page
Your browser does not support the video tag.