Laserfiche WebLink
request is to increase that threshold to $100,000. <br />In this fiscal year, the following Work Authorizations have already been approved <br />administratively: <br />Calvin Giordano & Associates totals $23.502.50 and includes: <br />Engineering services related to utility service line design, permitting and <br />installation at the Public Works modular under the Lehman Causeway in the <br />amount of $5,675.25. <br />Preparation of an Elevation Certificate for the Public Works Modular under the <br />Lehman Causeway as required by Florida Building Code in the amount of <br />$625.00. <br />Engineering services related to electrical and lighting design for area lighting at <br />Gwen Margolis Park for installation by the contractor installing artificial turf at the <br />park in the amount of $6,373.50. <br />Land surveying services for the preparation of a route survey in support of the <br />solid wall under the Lehman Causeway in the amount of $5,027.50. <br />Field Inspection, Construction Administration and Closeout services for the utility <br />line installation from Collins Avenue to the pier project in the amount of <br />$5,801.25. <br />CES Consultants. Inc. totals $3.450.00 includes: <br />Geotechnical investigations, laboratory evaluation and engineering analysis and <br />report for soils conditions on the Intracoastal Park in support of foundation design <br />(by others) in the amount of $3,450.00. <br />COST: <br />None at this time. <br />FUNDING SOURCE: <br />Funding is available in the respective capital projects budget. <br />ATTACHMENTS: <br />e Resolution <br />Agenda Item No.I OF <br />Dare 1/18/2013 <br />142 <br />