Shop Drawings/ RFI's/ Clarifications received after November 26, 2012 meeting to Present <br /> Hours Description <br /> 0.25 1. Restaurant Chimney Roofing (email from CGA dated 11/28/2012 - BHA <br /> 2. Grease Trap, Salt Water Distribution & Fire Protection Shop Drawings (74Rev3)- Project Caine <br /> 1 3. Restaurant Slab Ultrasonic Testing email from CGA dated October 18,2012) - Botas <br /> 0.5 4. Paint for PVC Piping (Submittal No. 95) - BHA <br /> 5. RFI # 107 Restaurant-Kitchen Exhaust fan & duct Relocation- Project Caine <br /> 6. Mechanical Submittals: Revised Submittal # 29M-Rev-1-Fire Damper& New Submittal # <br /> 97M60"x60"-Return Air Vent- Project Caine <br /> 0.25 7. RFI # 107 Restaurant-Kitchen Exhaust fan & duct Clarification - BHA <br /> 8. RFI # 106 Proposed Return Air Vent & CMU in Mechanical Rook - Project Caine <br /> 0.25 9. RFI # 108 Soffit Attachment Detail - BHA <br /> 2 10. Concrete Patching Material- BHA <br /> 11. UPS Submittal (email CGA dated December 18, 2012) - Project Caine (Items 11 & 16) <br /> N/C 12. RFI # 114-Clarification on Wall Finishes - BHA <br /> N/C 13. RFI # 113- Clarification on Drywall Framing System - BHA <br /> 0.25 14. Restaurant Plumbing Pipes not constructed as shown on the plans- BHA <br /> N/C 15. Need Pier Painting Clarification- BHA <br /> 16. Newport-UPS Submittal Unistar III - Project Caine (Included in Item 11) <br /> N/C 17. RFI # 114 Clarification on Wall Finishes (Third email) - BHA <br /> 18. Submittal No. 20 Switchgear- Project Caine <br /> 19. Light Fixtures- Project Caine <br /> 0.25 20. Insulation Requirement (CGA email dated January 8, 2013) - BHA <br /> 21. Mechanical Submittals -60"x60" Return Air Vent (Silencer+Grill) - Project Caine <br /> 0.25 22. RFI # 115 Proposed Mechanical Duct Layout Plan-2nd Floor) - BHA <br /> 23. Submittal 27(R1)-Greenheck EVH602 Louvers - Project Caine <br /> 0.25 24. Stair Soffit (email from CGA dated January 16, 2013) - BHA <br /> 3 25. Railing Submittal from SAFTRON - BHA <br /> 26. Return Air Grille & Silencer submittal - Project Caine <br /> 0.5 27. RFI # 107 Restaurant - Kitchen Exhaust fan & duct - BHA(0.5 hrs) <br /> 28. Newport Pier-Concrete Mix Design, Submittal 103- Concrete Mix Design - For 2" Topping And <br /> 2 <br /> Curb Mechan - Botas <br /> 29. Grease Trap-Below Grade Installation Detail - Project Caine <br /> 0.25 30. RFI # 114 Clarification on Wall Finishes (Fourth email) - BHA <br /> 31. Mechanical Submittals 60"x60" Return Air Vent (Silencer+Grill) - Project Caine <br /> 2 32. RFI # 120- Beam Penetrations required for Electrical Conduits- Botas <br /> 33. RFI # 119 Electrical Clarification- Project Cane <br /> 34. Meter Cans & main Disconnets - Project Caine <br /> 1 35. Submittal Hood - CGA requesting a site meting for BHA ( 1 Hr) <br /> 0.5 36. Proposed Salt Water Distribution line BHA (0.5 hrs) <br /> 37. Submittal 22 - Rev. 1 - Fire Alarm Submittal - Project Caine <br /> 2 38. Saffron Railing - BHA <br /> 0.25 39. Acoustical Ceiling Tiles & Grid System (Samples included) - BHA <br /> 40. Proposed Salt Water Distribution System (email from CGA dated 1/30/2013) <br /> Botas = 5 hrs and BHA 11.75 hrs (Total = 16.75) <br /> S / 8 <br />