My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2013-2061
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2013
>
Reso 2013-2061
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2014 2:37:37 PM
Creation date
5/24/2013 11:12:39 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2013-2061
Date (mm/dd/yyyy)
05/16/2013
Description
3rd Amendment to Agmt w/Beiswenger (BHA), for Fishing Pier
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Shop Drawings/ RFI's/Clarifications received after November 26, 2012 meeting to Present <br /> 41.Submittal#94-Salt Water System Distribution System -Project Caine/BHA N/C <br /> 1 42 RFI# 122-6 Inch Core in Stairwell's CMU Wall inch Fire Line-Botas <br /> 0.75 43. RFI# 123-STUCCO SCORE LINES and Electrical Room Walls- BHA(0.75)hrs <br /> 5 44. RFI# 125 Plumbing Penetration -Botas <br /> 1 45. Proposed Topping/Slab Mechanical Rool- Botas(1 hr) <br /> 0.25 46. Submittrasl No. 10 106, 107, 108,109,45R(2 sheets) BHA <br /> 2 47. Submittal# 112-Steel Cover Plates-BHA <br /> 1 48. 1st Floor HVAC- Duct Penetration- Proposed Remedial Detail RFI#99- Botas <br /> N/C 49. Submittal#47 (Previously Submited)-Clarafication -BHA <br /> 1 50. Request to SepaRate CADD Files(NOT IN CONTRACT)-BHA <br /> 1 51. RFI# 126 Electrical Conduits at Entrance/Beam -Botas <br /> N/C 52. RFI# 126 Electrical Conduits at Entrance/Beam (For Information) <br /> 53. RFI# 128- Restauratn 1st and 2nd Floor Grilles-Project Caine <br /> 54. Fire Alarm Permit Application Rejection Comment -Project Caine <br /> 55. Salt Water Distribution Strainer- Project Caine <br /> 5SA. Proposed Salt Water Distribution System Submittal No. 94- Project Caine <br /> 1.5 56. RFI# 130 UPS&Cone Drilling- Botas <br /> 57. Fire Suppression sytem- Plans& Electrical Requirements- Project Caine <br /> 58. Submittal# 113 Toilet Accessories, Submittal No 114-Hand Dryer& Submittal No. 115 Fire Extinguishers- <br /> 2 BHA <br /> 59. RFI# 133 Navigational Lights- Project Caine <br /> 0.5 60. Submittal# 116-6" High Vinyl Based - BHA <br /> N/C 61. Handrail at Fishtables(email from CGA dated 3/14/13) - BHA <br /> N/C 62. RFI# 115 Project Caine$900.00 will be paid by Contractor- BHA N/C <br /> 0.5 63.Vinyl Base Submittal 3/19/13 -BHA <br /> N/C 64. RFI # 141 Electric Hand Dryers- No Power shown on the Electrical Plans- Project Caine <br /> N/C 65. RFI# 140 Electrical Oulets in Food Service Area (Conflict) - ProjectCaine <br /> 66. Submittal# 118 Water Heater- Project Caine <br /> N/C 67. 2 Hour Stair Entry Revision- BHA...Kurt Cira <br /> 1 68. RFI# 142 -Gas heater Vent Relocation - Botas <br /> 69. RFI# 122 Fire Dampers (6" and 18"Size)- Project Caine <br /> 70. RFI- Bathroom Fixtures- Project Caine <br /> 71.Submittal 74(R4) Fire Protection Shop Drawings& Hydraulic Calculations- Project Caine <br /> 1.5 72.Submittal No. 121 Building signages- BHA <br /> 1.5 73.Approach Guard Rail- Botas <br /> 0.5 74. Submittal# 124- Black-out Film for Mechanical Room Door- BHA <br /> 1 75. Submittal# 125- Rev 1 - BHA <br /> 7• • •• • •- : • - ulations -De '• . <br /> • •mrtta •0. -. . . . - - - - <br /> 47- Fire uppression s em- - • - . <br /> outlinework.xls <br /> Botas= 12 hrs and BHA= 11 hrs(Total = 23) <br /> 8 / B <br />
The URL can be used to link to this page
Your browser does not support the video tag.