Laserfiche WebLink
Plugging of a partially completed drainage structure at Bella Vista Bay Park and <br /> limited rough grading of the site to minimize hazards to persons traversing the <br /> area. The cost of this work was $3,790.00. <br /> Replacement of a top concrete slab, inlet frame and grate for an existing catch <br /> basin in 1831d Street just west of Collins that was failing. The cost of this work <br /> was $5,675.25. <br /> Removal of obstructions in the Samson Park sewer line that serves the City <br /> restrooms. The obstructions had backed up the lateral and rendered the <br /> restrooms inoperable. The cost for this repair work was $5,007.50. <br /> Removal of excess construction materials from the Intracoastal Park (south of <br /> Poinciana Drive). The cost of this work has not yet been finalized and is being <br /> backcharged to the Collins Streetscape project contractor. <br /> COST: <br /> None at this time. <br /> FUNDING SOURCE: <br /> As proposals are received, project budgets will be encumbered. <br /> ATTACHMENTS: <br /> • Resolution <br /> • Agreement <br /> Agenda Item No.I01 <br /> Daze 5/16/2013 <br /> ISO <br />