My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ric-Man International Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(13-08-01) Design build svcs for Gateway Park Pedestrian bridge- STEP 1
>
Responses
>
Ric-Man International Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2013 5:46:49 PM
Creation date
9/9/2013 4:21:58 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design build svcs for Gateway Park Pedestrian bridge- STEP 1
Bid No. (xx-xx-xx)
13-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUALIFICATIONS - SCHEDULE <br />Activity Activity <br />ID Descriptil <br />SUBMITTAL <br />REC -0010 <br />RECOMMENDATION TO AWARD <br />REC -0020 <br />FEE NEGOTIATION <br />REC -0030 <br />NOTICE TO PROCEED <br />DS- 0010 <br />30 % DESIGN /CONCEPTUAL <br />DS- 0020 <br />90% DESIGN <br />OS -0030 <br />100% DESIGN <br />PERM -0010 <br />FOOT PRE - PERMITTING MEETING <br />PERM -0020 <br />FOOT PERMITTING <br />PERM -0030 <br />CITY OF SUNNY ISLE REVIEWAND PERMIT <br />PERM -0040 <br />LAND ACQUISITION BY CITY <br />CONS -0010 <br />UTILITY RELOCATIONS/SITE CLEARING <br />CONS-0020 <br />PILES FOR ENDBENTS /ABUTMENTS <br />CONS -0030 <br />ABUTMENT, ENDSENTS AND ELEVATOR SHAFTS <br />CONS -0040 <br />ELECTRICAL FOR ELEV. AND LIGHTING INCL FPL COORD <br />CONS -0050 <br />BRIDGE INSTALLATION INCLUDING 1 DAY SHUTDOWN <br />CONS -0060 <br />SIP INSTALLATION <br />CONS -0070 <br />BRIDGE CONCRETE INSTALLATION <br />CONS -0080 <br />STAIR INSTALLATION <br />CONS -0090 <br />LIGHTING INSTALLATION ON BRIDGE <br />CONS -0100 <br />ELEVATOR INSTALLATION INCLUDING ELECTRICAL <br />PC -0010 <br />RESTORATION - CONCRETE, ASPHALT, CMU WALL, ETC. <br />IPC -0020 <br />SUBSTANTIAL COMPLETION <br />IPC -0030 <br />FINAL COMPLETION <br />st.n Dal. <br />RnO Date <br />Data Date <br />Run Dal. <br />© Primavera Systems, Inc. <br />Orig Early Early <br />Dur Start I Finish <br />1 170CT13' <br />170CT13 <br />518OCT13 <br />240CT13 <br />1 250CT73 <br />2SOCT13 <br />1 17OCT13 <br />170CT13 <br />10 OSJAN14 21JAN14 <br />15 22JAN14 11FEB14 <br />44 12FEB14 14APR14 <br />2012MAR14 0BAPRI4 <br />515APR14 21APR14 <br />5 22APR14 28APR14 <br />529APR14 OSMAY14 <br />10 06MAY14 19MAY14 <br />10 04SEP13 17SEP13 <br />1120MAY14 20MAY14 <br />10121MAY14 03JUN74 <br />22 04JUN74 03JUL14 <br />0 <br />OII FRFQ SUBMITTAL <br />01 RECOMMENDATION TO AWARD <br />' PEE NEGOTIATIONI <br />pl NOTICE Tp PROCEED <br />01 3Q% DESIGN /CONCEPTUAL <br />01 - 90% DESIGN <br />0� 10D%I DESIGN <br />0 FOOT PRE - PERMITTING MEETING <br />01 A64000T PERMITTING. <br />O CITY OF SUNNY ISLER IEWANDPERMIT <br />OI . VWLANO ACQUISITION EY CITY- -I- <br />0 UTILITY RELOCATIC <br />01 PILES FOR ED <br />OI L <br />OI. <br />01 <br />O <br />OI <br />OI �AMWLI HTING INSTALLATION ON BRIDGE <br />OI <br />01i' l <br />0 <br />TE CLEARING <br />4T &ABUTMENTS <br />ABUTMENT, EN DBENTS AND ELEVATOR SHAFTS <br />.ECTRICAL FOR ELEV. AND LIGHTING INCL FPL COORD <br />BRIDGE INI4TALLATION INCLUDING 1 DAY SHUTDOWN <br />SIP INSTALLATION <br />BRIDGE CONCRETE INSTALLATION <br />STAIR INSTALLATION <br />ELEVATOR INSTALLATION INCLUDING ELECTRICAL <br />RESTORATION - CONCRETE, ASPHALT, CMU WALL, ETC. <br />SUBSTANTIAL COMPLETIpN <br />FINAL COMPLETION <br />a=1 RIC -MAN INTERNATIONAL, INC. <br />033'E`1° <br />046EP13 DESIGN /BUILD SERVICES FOR GATEWAY PARK PEDESTRIAN ACCESS IMPROVEMENTS <br />04SEP1303.41 <br />L, <br />7 Early Bar <br />Progress Bar <br />IF Critical Activity <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.