Laserfiche WebLink
D <br />1 <br />1 <br />1 <br />1 <br />1 <br />L <br />I <br />I <br />1 <br />I <br />Jeffrey S. Crews PE, LEED AP <br />Design — Project Manager <br />Mr. Crews, with over 24 years of experience, has been design and field engineer on various projects in the held of <br />structural and civil engineering. Mr. Crews' civil experience has included the preparation of utility relocation plans, <br />drainage analysis, development of traffic control, and stormwater pollution prevention plans. Mr. Crews also has extensive <br />design, construction inspection, and administration experience in all types of building structures. Mr. Crews' bridge <br />experience includes both the designs of new structures as well as rehabilitation of existing structures. This experience has <br />included casFin- place, AASHTO girders, Repair and inspection of steel bridges, box culverts, and rehabilitation of Bascule <br />bridges and tender house facilities. Mr. Crews has also inspected and rehabilitated historic bridges such as the bridges <br />along the Venetian Causeway in Biscayne Bay. <br />EDUCATION <br />Bachelor of Science in Civil Engineering, Cum laude, <br />University of Miami, Miami, Florida, 1988 <br />Certified, Masonry Inspector, No. SMI -74, 2012 <br />REGISTRATIONS <br />LEED Accredited Professional, U.S. Green Building <br />Council <br />Professional Engineer #46575, State of Florida <br />PROJECT EXPERIENCE <br />Miami Beach Design Criteria for Sunset Island 3, Sunset <br />Island 4, Palm Island, and Hibiscus Island', Miami <br />Beach, Florida <br />Design Criteria Professional and Project Manager for the <br />preparation of design-build criteria packages including design <br />development plans. This project was a full reconstruction project <br />of Sunset Island 3, Sunset Island 4, Palm Island, and Hibiscus <br />Island. The scope of work includes drainage, roadway, water, <br />sewer, landscaping, lighting, and undergrounding of utilities <br />jFPL, A IT and Comcastj. Project also includes cost estimating, <br />maintenance of traffic, scheduling, storm water pollution <br />prevention, permitting, and construction management. <br />Vincent Torres Park Pedestrian Bridge, Lauderdale Lakes, <br />Florida <br />Sunset Drive Bridge Replacement between Sunset Islands <br />No. 18 2, FDOT District 6• <br />Project Engineer far replacement of an existing ten span, 250 <br />foot bridge with a two lane seven span cast -in -place continuous <br />concrete slab bridge supported on concrete bents and 24 inch <br />piling. Project consists of providing architectural treatment, <br />reinforcement of bulkheads, major utility adjustments and a <br />critical M.O.T. due to condition of existing structure. Project also <br />includes approximately 400 linear feet of adjacent roadway <br />requiring gravity wells for drainage. <br />Venetian Causeway Bridges Rehabilitation / Restoration <br />Study, Miami Beach, Florida, FDOT District 6` <br />Project Engineer assigned to the bridge inspection team for <br />inspecting ten concrete girder fixed span bridge and two <br />bascule bridges. The in -depth bridge inspection performed on <br />these historic bridges was for the purpose of developing our in- <br />depth condition survey to develop preservation / rehabilitation <br />schemes. Inspected components included structural steel on <br />bascule leaves, superstructure and substructure elements of <br />concrete girders, utility supports and bridge railings. Upon <br />completion of the condition survey a recommendations report <br />was prepared for FDOT. <br />N.W. 54th Street Bridge over Miami Canal, Miami <br />Springs, FDOT District 6' <br />Senior Project Engineer / Bridge Inspection Team Leader for the <br />m -depth inspection of this Historic 1920's Warren Pony truss <br />swing span. The existing bridge consists of two structural steel <br />1 12-h. long trusses. The bridge inspection consisted of <br />developing an in -depth condition survey for preservation and <br />strengthening of the existing bridge. The existing swing span is <br />nonoperable. <br />East 1 st Avenue Bridge over Miami Canal, Miami <br />Springs, Florida, FDOT District 6' <br />Senior Project Engineer / Bridge Inspection Team Leader for the <br />indepth inspection of this Historic 1928 Parker truss vertical lift <br />span The existing bridge consists of two structural steel 133 -ft. <br />long trusses supported by the lift towers. The bridge inspection <br />consisted of developing an in-depth condition survey for <br />One Team. Infinite Solutions. 45 <br />Project Manager far the redevelopment of an existing park 8 <br />pedestrian bridge for the City of Lauderdale Lakes. The project <br />was being performed as collaboration with the Broword County <br />School Board to provide a student drop off for a new <br />Elementary school on an adjacent property. The project <br />featured a 1 10' long fully, enclosed pedestrian bridge to <br />provide access for the students across the South Florida Water <br />Management District C -13 Canal. The project also included <br />approximately 1500' of new roadway with additional parking, <br />as well as several hundred feet of covered walkway for student <br />protection. The project also included the development of a <br />concession and restroom building for the park, as well as <br />renovation of an existing press box structure. New sports field <br />lighting was also provided for all of the play fields . <br />denotes projects completed with other firms <br />Sunset Drive Bridge Replacement between Sunset Islands <br />No. 18 2, FDOT District 6• <br />Project Engineer far replacement of an existing ten span, 250 <br />foot bridge with a two lane seven span cast -in -place continuous <br />concrete slab bridge supported on concrete bents and 24 inch <br />piling. Project consists of providing architectural treatment, <br />reinforcement of bulkheads, major utility adjustments and a <br />critical M.O.T. due to condition of existing structure. Project also <br />includes approximately 400 linear feet of adjacent roadway <br />requiring gravity wells for drainage. <br />Venetian Causeway Bridges Rehabilitation / Restoration <br />Study, Miami Beach, Florida, FDOT District 6` <br />Project Engineer assigned to the bridge inspection team for <br />inspecting ten concrete girder fixed span bridge and two <br />bascule bridges. The in -depth bridge inspection performed on <br />these historic bridges was for the purpose of developing our in- <br />depth condition survey to develop preservation / rehabilitation <br />schemes. Inspected components included structural steel on <br />bascule leaves, superstructure and substructure elements of <br />concrete girders, utility supports and bridge railings. Upon <br />completion of the condition survey a recommendations report <br />was prepared for FDOT. <br />N.W. 54th Street Bridge over Miami Canal, Miami <br />Springs, FDOT District 6' <br />Senior Project Engineer / Bridge Inspection Team Leader for the <br />m -depth inspection of this Historic 1920's Warren Pony truss <br />swing span. The existing bridge consists of two structural steel <br />1 12-h. long trusses. The bridge inspection consisted of <br />developing an in -depth condition survey for preservation and <br />strengthening of the existing bridge. The existing swing span is <br />nonoperable. <br />East 1 st Avenue Bridge over Miami Canal, Miami <br />Springs, Florida, FDOT District 6' <br />Senior Project Engineer / Bridge Inspection Team Leader for the <br />indepth inspection of this Historic 1928 Parker truss vertical lift <br />span The existing bridge consists of two structural steel 133 -ft. <br />long trusses supported by the lift towers. The bridge inspection <br />consisted of developing an in-depth condition survey for <br />One Team. Infinite Solutions. 45 <br />