Laserfiche WebLink
I <br />I <br />1 <br />1 <br />11 <br />LJ <br />1 <br />F <br />1 <br />I <br />1 <br />1 <br />C <br />1 <br />1 <br />1 <br />Ernesto A. Fabregas PE, CFM <br />Senior Drainage Engineer <br />0111 <br />Starltec <br />Mr. Fabregas has over 37 years of experience in the design and construction of large -scale civil engineering and <br />transportation projects. His background in construction has included several design build projects giving him an <br />exceptional background. In addition he has been heavily involved in the area of drainage design for transportation <br />projects. He has an indepth knowledge of permitting requirements under SFWMD and SJRWMD permit criteria and has <br />utilizing various software packages as AdICPR, Pond Pack, Flow Master, Culvert Master, WSPRO, HEC -22, TR -55, FDOT <br />Optional Culvert Estimator and has developed various Hydraulic Design Mothcad and Excel spread sheet programs. Mr. <br />Fabregas has been providing services to FDOT D-4 Drainage Office as an extension of staff (On Call Basis) for <br />approximately 5 years addressing drainage issues and developing project designs in Broward, Palm Beach, Martin, St. <br />Lucie and Indian River Counties. This included development of D-4's Drainage Inquest Database, Drainage Connection <br />Procedures, Pond Siting Procedures and procedures to address the FDEP New Statewide Stormwater Rule on FDOT <br />projects. <br />EDUCATION <br />M.S. Organization & Management of Construction, <br />Moscow Management Institute, Moscow, Republic of <br />Russia, 1980 <br />B.S. Civil Engineering Validation, University of Miami, <br />Miami, Florida, 1997 <br />B.S. Civil Engineering Structures and Roadways, <br />Universidad de Oriente, Santiago de Cuba, Cuba, <br />1975 <br />Training, AASHTO, Roadside Design Guide, 2003 <br />Training, SFWMD, ERP, 2002 <br />Training, FDOT, Specifications Package Preparation, <br />2003 <br />Training, FDOT, PPM, 2004 <br />Certification, FDOT, Advanced Work Zone Traffic <br />Control, 2009 <br />Training, FES, Stormwater Management Design Course, _ <br />Training, SFWMD, SHGWT, 2000 <br />REGISTRATIONS <br />Professional Engineer #53841, State of Florida <br />PROJECT EXPERIENCE <br />SR 91 NB /SB Bridges over the Rim Ditch Canal, St. <br />Lucie County, Turnpike Enterprise` <br />Project Engineer for the drainage evaluation and the <br />development of two sets of construction plans. The first set <br />consisted of the replacement of the travel lanes for both bridge <br />structures. This consisted of the removal and replacement of a <br />264t strip of bridge deck for each structure along the entire <br />length of these twin six span bridges. This involved the <br />development of a unique TCP concept to allow a 13-11 strip by <br />three spans to be completed in less than six days. The project <br />also included the replacement of the expansion joints, crack and <br />spall repairs to the deck and bridge piling. The second set of <br />plans consisted of the painting of the six span steel girder <br />structure. <br />SR 826/SR 836 Interchange Reconstruction Design-Build- <br />Finance, Miami -Dade County, FDOT District 6 and <br />Miami -Dade Expressway Authority' <br />Senior Drainage Engineer for the complex MOT scheme <br />developed to support the reconstruction of this $560 million, <br />louraevel interchange in the heart of Miomi-0ade County. The <br />project includes the reconstruction of approximately 2 miles of <br />SR 826 from SW 8th Street to NW 25th Street and <br />approximately 3 miles of SR 836 from NW 87th Avenue to <br />NW 57th Avenue to provide -5 lanes in each direction along the <br />mainline plus the introduction of EBCD and WBCD roads along <br />SR 836. The job includes the construction of 47 new bridges <br />that include 7 steel bridges, 36 Florida I-beam bridges and 4 <br />segmented bridges Other improvements include retaining walls, <br />lighting, sound walls, canal relocation, utilities JPA plans, <br />signalization, new signing and pavement markings, new ITS, <br />and special aesthetic features. <br />1-195 (SR 1 12) from 195 to Biscayne Bay, Miami -Dade <br />County, FDOT District 6' <br />Drainage Engineer of Record for the widening of 1.75 miles of <br />interstate roadway to provide safety and operational <br />improvements. Improvements for this operational safety <br />improvement project to two miles of this limited access facility <br />include provisions for a new, exclusive, auxiliary lone along 1- <br />195 eastbound to North Miami Avenue from T95 northbound, <br />and a new auxiliary lone from North Miami Avenue along L <br />195 westbound to 1-95 northbound. The project also involves <br />replacing median curbs with a median barrier wall, widening <br />eight bridges, constructing new retaining walls, concrete <br />pavement rehabilitation, and surface sheet improvements to <br />north Miami Avenue. <br />i. denotes projects completed with other firms One Team. Infinite Solutions. <br />54 <br />