My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lynx Construction Management
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(13-08-01) Design build svcs for Gateway Park Pedestrian bridge- STEP 1
>
Responses
>
Lynx Construction Management
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2013 5:53:47 PM
Creation date
9/9/2013 4:33:18 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design build svcs for Gateway Park Pedestrian bridge- STEP 1
Bid No. (xx-xx-xx)
13-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L AG X <br />-/CONSTRUCTION <br />MANAGEMENT <br />George N. Khoury, PE <br />BNI, Structural Engineer <br />George Khoury's career includes the design of a variety of structural systems for a broad range of <br />project types, ranging from parking garages, residential, educational facilities, healthcare, and <br />sports facilities. His diversified experience in structural engineering analysis, design and <br />' management combined with his passion for excellence and teaching make him perfectly suited for <br />the role as engineering director. <br />George started his career as a structural engineer for a major precast pre- stressed company <br />working closely with structural engineers and contractors. During his tenure there, he gained a <br />good understanding of constructability and value engineering, and a great respect for those <br />managing and performing the construction process. <br />1 George represents the firm throughout the life of a project, starting from the conceptual design <br />stage through construction administration. His design experience includes cast -in -place concrete, <br />composite precast concrete, post- tensioned concrete, light gage steel, wood, and structural steel <br />tsystems. <br />Relevant Projects (Pedestrian Bridges & Parking) <br />Centre City Mall, Chaguanas, Trinidad W.I. <br />• New 780,000 -SF multi -story mall and 5 -story 429 car parking garage located in a highly seismic area. <br />• Provided creative and architecturally appealing solution for 120 -ft span mall- bridge over an existing <br />road. <br />• Principal In Charge <br />Causeway Square Garage, North Miami, Florida <br />t• 3 levels; 260 -car garage. <br />• The garage is connected to an office building with a 57 feet covered bridge. <br />• Principal in Charge, Engineer of Record <br />Tallahassee Memorial Hospital, Tallahassee, Florida <br />t• 653,000 -SF expansion to Florida's eighth largest hospital <br />• 153 -foot long, 2 -story covered bridge to connect the new addition to the existing hospital. <br />• Engineer of Record, Project Manager <br />Capping Bridge at the Gate District Towers, Abu Dhabi, UAE <br />• 1,400 -ft. long capping bridge on top of three 63 -story residential towers. <br />• The bridge is approximately 41 -ft deep and 99 -ft. wide, with Individual spans of up to 220 feet, and <br />cantilevers 130 -ft beyond the last tower. <br />• The capping bridge houses two levels of luxury penthouses and garden spaces. <br />FL: CGC1518484 M5: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 25 of 66 <br />FL: CMC1250004 NC:69344 O: 305.523.3656 I F: 888.499.1748 1 LynxConstructionManagement.com RFQ# 13 -08 -01 <br />TN: 63012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.