My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lynx Construction Management
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(13-08-01) Design build svcs for Gateway Park Pedestrian bridge- STEP 1
>
Responses
>
Lynx Construction Management
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2013 5:53:47 PM
Creation date
9/9/2013 4:33:18 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design build svcs for Gateway Park Pedestrian bridge- STEP 1
Bid No. (xx-xx-xx)
13-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LJ <br />I <br />H <br />1 <br />1 <br />1 <br />L <br />I <br />1 <br />1 <br />L N X <br />CONSTRUCTION <br />MANAGEMENT <br />4. APPROACH / METHODOLOGY <br />Sunny Isles Pedestrian Crossing Bridge Approach <br />Lynx Construction Management will bring a team that has expert knowledge of the local working <br />environment and the unique needs of government in the design -build process. Our staff and <br />designers have a proven track record working in the South Florida area including major agencies <br />and municipalities and institutions. We are currently working with FDOT, Town of Surfside, and <br />City of Miami Beach- Jewish Community Services. We understand the reporting, project control and <br />local wage requirement. As the design - builder we will create a partnership between the owner, <br />architect and construction team to provide the best value project for the City of Sunny Isles Beach. <br />Our emphasis on service will begin in the pre- construction phase and include coordination with all <br />agencies having jurisdiction. It will continue through closeout to the end of the warranty period. <br />We expect to create a long term relationship with the City that continues past the end of this <br />project. <br />Leadership and Mutual Goals <br />Our senior staff has over three billion dollars of public sector design and construction experience <br />and will bring that expertise and knowledge of public sector owner's needs to the project. This will <br />streamline the planning, review, permitting and approval processes to keep the project on -time <br />and within budget. We will provide the City with all of the information and support required to <br />properly communicate project status to the community and the City Commission. <br />Lynx Construction Management with the Owner will use our team approach to develop a project <br />that meets our mutual goal of building a pedestrian crossing which will provide safe passage for <br />people accessing the Gateway Park development and surrounding areas offering the best value <br />engineering cost savings to the City. <br />Collaborative Approach <br />Lynx uses a collaborative approach which involves the entire team in all important decisions. It <br />ensures that communication takes place regularly and that all important information is available to <br />team members when needed. We use web based tools to maintain an environment that fosters <br />effective communication. Our clients /owners, designers, and construction team are all provided <br />access to our collaboration tools. <br />1 Design Philosophy for Sunny Isles Pedestrian Bridge <br />Lynx will work with the City and MC Harry, our Architect, to develop a design approach in keeping <br />with the beauty and environment of "Florida's Riviera ". Our team will listen closely and learn the <br />needs of the City and the community. We will provide a structure that addresses the local values, <br />function and aesthetics of the City. Our project will be on -time and in- budget. <br />Lynx and our Design Team will: <br />• Provide a safe pedestrian crossing <br />1 • Compatible with surrounding environment <br />• Enhance the local aesthetic and beauty of the City <br />FL: C13CI5184M 145: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 38 of 66 <br />FL: CMC1250004 NC:69344 0:305.523.36561 F: 888.499.17481 LynxConstruction Management.com RFQ #13 -08 -01 <br />TN: 63012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.