My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2019-2964
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2019
>
Reso 2019-2964
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2019 12:24:06 PM
Creation date
7/29/2019 3:29:12 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2019-2964
Date (mm/dd/yyyy)
07/18/2019
Description
Approv Agmt w/Craven Thompson for Engineer Consult Svcs for Golden Shores Utility Undergrounding
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Genesis Cuevas <br /> CTA Proposal No. 2018-UO3.383 (Revised) <br /> July 18, 2019 <br /> Page 6 <br /> equipment to the extent possible. In addition, CTA shall identify proposed easements <br /> required to accommodate additional above-grade improvements. CTA assumes most <br /> underground features to be located within the right-of-way with the occasional <br /> exception for larger equipment and service connections. <br /> 2.3 Prepare Design Development Plans <br /> Based upon input on Preliminary plans from FP&L and utility providers, CTA shall <br /> incorporate individual design improvements into the Underground Plan. Once updated <br /> CTA will redistribute to all utilities for confirmation and further coordination. <br /> 2.4 Prepare Easement Descriptions <br /> Most of the proposed equipment is assumed to be placed within the public right-of- <br /> way. However, there will be occasion for some equipment to be placed on private <br /> and/or public property therefore requiring an easement dedication. Based upon <br /> information coordinated with the utility requesting the easement, CTA shall provide <br /> specific purpose survey and sketch and legal description of the easement. Pursuit of <br /> easement dedication and/or processing/recording of the easement is by the City. <br /> Although the exact number of easements cannot be determined without plans, based <br /> upon preliminary information from FPL, it is anticipated that fifteen (15) easements will <br /> be required. Preparation of individual sketches with legal descriptions of each FPL <br /> Equipment Site that are ready for recording purposes in the Public records of Miami <br /> Dade County. <br /> Approximate time of completion:two-three(2-3)weeks after Task 1.1.b is completed. <br /> 2.5 Site Lighting Plan <br /> With removal of the overhead lines, existing power-poles and attached lighting will be <br /> removed. It is the City's intent to replace the existing lighting with decorative poles <br /> more evenly distributed throughout the neighborhood. With assistance from Hillers <br /> Electrical Engineering (HEE), a lighting plan shall be prepared. Plan will be based upon <br /> fixture and criteria established by City. Service to lighting will be established with FPL <br /> and coordinated through the undergrounding plans. <br /> 2.6 Prepare Construction Documents <br /> Based upon input from Design Development plans from FP&L and utility providers, CTA <br /> shall refine the Underground Plan into Construction Documents (CD's). Plans shall <br /> incorporate sufficient detail for construction of proposed improvements and be used as <br /> basis for bids and permits. With permit approvals, plans will progress to 100%CD's. <br /> CRF JEN.1HOMPSON&ASSOCIPJES INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.