My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2019-2964
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2019
>
Reso 2019-2964
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2019 12:24:06 PM
Creation date
7/29/2019 3:29:12 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2019-2964
Date (mm/dd/yyyy)
07/18/2019
Description
Approv Agmt w/Craven Thompson for Engineer Consult Svcs for Golden Shores Utility Undergrounding
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Genesis Cuevas <br /> CTA Proposal No. 2018-UO3.383 (Revised) <br /> July 18, 2019 <br /> Page 7 <br /> 2.7 Process Permits <br /> Because the proposed work is assumed to take place entirely within CITY right-of-way <br /> and because no modifications to the existing storm system and/or utilities are <br /> anticipated, permitting services are not believed to be necessary and are therefore are <br /> excluded from this proposal. <br /> 2.8 Meetings and Coordination: <br /> Because of the complexity of this project with its multiple variables <br /> and tasks, <br /> p Y <br /> p <br /> complicated bylonglead times and constraints on delivery, a schedule of sufficient <br /> P Y <br /> detail is necessary to ensure success. CTA shall identify components of the project, and <br /> show dependency upon one another to identify critical milestones and prepare a work <br /> plan for meeting schedule demands. CTA shall utilize the schedule as a means to <br /> monitor progress. In addition, CTA shall create and track a list of outstanding Action <br /> Items and provide periodic reports to CITY with regard to project status and progression <br /> of tasks. <br /> 2.9 Landscape Field Review and Restoration: <br /> Based on proposed plans, CTA shall provide a field investigation to determine impacts <br /> to existing landscape improvements within the right-of-way. CTA shall provide a <br /> generic recommendation/specification for landscape protection, relocation, and <br /> replacement in addition to plans and/or details where more specific direction is <br /> required. Because the extent of these services cannot be defined without plans, CTA's <br /> services are based on an estimated budget and billed on a time and material basis. <br /> III. Phase 3—Bidding&Construction <br /> 3.1 Prepare Bid Package: <br /> In order to advertise the project, a bid package must be compiled for procurement <br /> including plans, specifications, notice, and instruction to bidders. CTA shall provide <br /> specifications specific to construction of improvements. CITY will be responsible for <br /> providing General Conditions, bid notice, and instructions to bidders. Bid tabulations <br /> and quantities will be provided by CTA based upon approved plans. <br /> 3.2 Bid Solicitation: <br /> Procurement of bids, advertising, replication and dissemination of bid documents will <br /> be byCITY. CTA shall assist in the biddingprocess byaddressingquestions from <br /> bidders, attending pre-bid meetings, assessing bids and qualification of bidders. <br /> Decision for award will be solely by CITY. <br /> CRAVEN 1HOMPSON&ASSOCIATES INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.