My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
envirowaste services group inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-08-01) Stormwater Management System Preventative Maintenance
>
Responses
>
envirowaste services group inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2019 4:25:05 PM
Creation date
9/16/2019 4:23:17 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
37542D-43 <br />MAINTENANCE <br />WM4 <br />Overall Score 96 Contractor: Envirowaste Services Group, Inc. <br />Contract: E2V99 <br />Evaluation Date: May 21, 2018 <br />Summary <br />The pursuit of the work was outstanding as the Contractor fulfilled the time requirement of the contract. All MOT setups <br />were in compliance with the Design Standards as the Contractor was very independent and safety conscientious. The <br />overall qualify was excellent as the debris and buildupp in the pipes were properly cleanedfremoved to provide maximum <br />drainage capacity. Upon advising the Contractor of discre ancies on an invoice, immediate corrective actions was taken. <br />Also, some prompting was needed for the reporting of DBE information into the EOC system. Interactions and <br />cooperation between the Contractor and the Department were excellent. Daily communication and a dissemination or <br />inrormaiton were key to the positive working relationship. The work produced was <br />excellent and the Department was <br />content with the services that were provided by the Contractor. <br />Pursuit and Timely Completion of Work <br />Maintenance of Traffic (MOT) & Safety Operations <br />Timely and Complete Submittal of Documents and Reports <br />Overall Quality Control, Environmental Compliance, and <br />Compliance with Contract Requirements <br />Interaction, coordination, and cooperation with Department personnel, <br />traveling public, other contractors, property owners <br />and Government agencies <br />Disadvantaged Business Enterprise (DBE) Reporting <br />CONTRACTOR <br />(Signature does not indicate concurrence) <br />COPIES: <br />Contractor <br />Project File <br />District Maintenance Engineer - Original <br />Cost Center Manager <br />Submitted By: <br />Excellent <br />Excellent <br />Satisfactory <br />Excellent <br />Excellent <br />Satisfactory <br />.-i"� Lk' �. �� �- 5I 22-119 <br />Manager , /J Date <br />Reviewed By: i� e f. kA ��L&12L� <br />Date os Center lriager Da <br />f <br />le <br />Reviewed By,* <br />is ict ai en E gineer Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.