My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Perkins
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(19-11-01) Prof Eng and Arch Srvcs Ped Bridge REVISED
>
Responses
>
Perkins
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 3:19:50 PM
Creation date
1/14/2020 3:18:59 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATES PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br />09 <br />21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)Ludlam Trail Corridor Master Plan / Miami, Florida <br />Ongoing Ongoing <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER b. POINT OF CONTACT NAME b. POINT OF CONTACT TELEPHONE NUMBER <br />Florida East Coast Industries Jose M. Gonzalez 305.520.2372 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />The Ludlam Trail Corridor Master Plan is a Trail and Development Master Plan. <br />Formerly the Florida East Coast Railway spur-line, the 100 feet wide, +/- 6 mile long <br />segment will ultimately be coded and incorporated into the Miami-Dade County <br />Comprehensive Development Master Plan. This study has been identified as an <br />opportunity for the implementation of a regionally significant trail and greenway <br />along the Ludlam Corridor that will link surrounding communities providing vital <br />neighborhood connections. <br />The former railway corridor will be converted into a publicly accessible pedestrian <br />and bicycle trail. This will boost mobility in the area, provide opportunities for <br />physical activity, and improve the economic vitality of the neighborhood. The <br />proposed land use provisions of the Ludlam Trail Corridor will be implemented <br />through the adoption of Land Development Regulations. Development and trail <br />standards will emphasize convenient pedestrian and bicycle access to public <br />transportation and will incorporate “Crime Prevention Through Environmental <br />Design” (CPTED) principles in order to enhance trail safety and security. <br />The continuous trail throughout the Corridor will also connect to the +/- 10 mile <br />Underline trail project being implemented by the Friends of the Underline in <br />collaboration with Miami-Dade County. <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />Perkins and Will Coral Gables, Florida Master Planning, Architecture, Landscape <br />Architecture <br />Scope: New Construction <br />Size: 6 miles <br />Construction Cost: n/a <br />Completion Date: Ongoing <br />Project Responsibilities and Role: Master <br />Planning, Urban Design, Architecture, <br />Landscape Architecture <br />Key Personnel: Pat Bosch, Design Principal, <br />Leo Alvarez, Landscape Architecture <br />Principal <br />Owner Point of Contact: <br />Jose M. Gonzalez, Senior Vice President <br />Florida East Coast Industries <br />t. 305.520.2372
The URL can be used to link to this page
Your browser does not support the video tag.