Laserfiche WebLink
19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) SR 826/Palmetto Express Lanes from North of Canal C-8 Bridge (NW162 St.) to East of NW 67th Avenue (FPID No. 435760-2-52-01) FDOT District 6, Miami, FL <br />YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2020 <br />CONSTRUCTION <br />2023 <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Engineer for the Temporary Traffic Control Plans for the reconstruction of this 1.5 mile segment of the Palmetto Expressway to widen for <br />the implementation of Express Lanes. The existing six-lane divided limited access facility will be widened to accommodate two express lanes <br />and provide auxiliary lanes between the interchanges. A tolling point will be provided within this section and a Single Point Urban Interchange <br />(SPUI) will be provided at NW 67 Ave. The project requires extensive coordination with the adjacent projects, FTE, City of Miami Lakes and <br />Miami-Dade County. The project is the second segment (Segment 2) of six segments that extends the Express Lanes from I-75 to the I- <br />95/Golden Glades Interchange. <br /> <br />b. <br />(1) TITLE AND LOCATION (City and State) Express Lanes - SR 826 from Flagler Street to NW 154 Street and I-75 from SR 826 to NW 170 Street, Miami, FL <br />YEARS COMPLETED <br />PROFESSIONAL SERVICES <br /> 2019 <br />CONSTRUCTION <br />2019 <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm <br />Roadway Engineer for this project. The scope of the proposed improvements includes design and construction of 10 miles of Express Lanes <br />along SR 826 and 3 miles along I-75. The project limits extend from West Flagler Street to NW 154th Street along SR 826, and from SR 826 to <br />NW 170th Street along I-75. The project includes the widening of 9 bridges along SR 826 as well as the new 826/I-75 Express Lanes connector. <br />c. <br />(1) TITLE AND LOCATION (City and State) Boca Grande Causeway North Swing Bridge over Gulf ICWW, Placida, Florida, Project No. 2010-03, Gasparilla Island Bridge Authority, Gasparilla Island, FL <br />YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION <br />N/A <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm <br />Roadway Engineer responsible for performing QA/QC of roadway and TTCP designs and plans for the Final Design for the replacement of a <br />220-foot swing-span bridge. Project consists of 678 feet of new bridge including a 250-foot deck girder swing span and approach spans utilizing <br />Florida I-Beams. Embankments are supported by MSE walls and protected by new bulkheads and revetment. In addition to the bridge structures <br />and new pile support tender house is part of the scope. Responsible for development of the preliminary roadway geometrics and proposed <br />drainage design. <br />d. <br />(1) TITLE AND LOCATION (City and State) SR 968/SW 1st Street Bridge over Miami River, FM No. 424407-1-52-01, Miami, FL <br />YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2020 <br /> CONSTRUCTION <br />2022 <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm <br />Lead roadway engineer responsible for TTCP and the geometrical realignment (both horizontal and vertical) of the approach roadway segments <br />associated with the replacement of the nationally registered historic SW 1st St Bridge crossing the Miami River. Constructed in 1929, the <br />existing 650.5-foot, 13-span bridge is the gateway crossing into downtown Miami. The new 507-foot bridge will include a 315-foot double-leaf <br />bascule span over a widened 125-foot navigation channel. Two new approach spans will consist of prestressed concrete beams providing at <br />least 16.5 feet of clearance over North and South River Drives. Bascule span roadway deck will be an exodermic concrete deck providing <br />protection of the steel superstructure and a safer/quieter riding surface. The existing roadway at both ends of the bridge will be raised by several <br />feet in order to accommodate the new bridge, requiring major reconstruction and a complex TTCP detour. <br />e. <br />(1) TITLE AND LOCATION (City and State) SR-90/US-41/Tamiami Trail Bridge project (FM No. 434922-1-52-01) FDOT District 6, Miami, FL <br />YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br /> CONSTRUCTION <br />2019 <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm Roadway, TTCP, and S&PM EOR for this project in the eastern Everglades of Miami-Dade County which replaced approximately 2 miles of the <br />existing at-grade roadway with 2 elevated bridges to restore the natural flow of water within the Everglades basin. This Design-Build project <br />required extensive coordination with National Parks Service and the Florida Department of Environmental Protection as well as local businesses <br />and residents. <br /> STANDARD FORM 330 (REV. 3/2013) PAGE 2 <br /> <br />2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME: Satiar Shirazi, PE 13. ROLE IN THIS CONTRACT: Highway Design Roadway 14. YEARS EXPERIENCE <br />a. TOTAL: <br /> 12 <br />b. WITH CURRENT FIRM: ≤ 1 <br /> <br />15. FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 <br />16. EDUCATION (Degree and Specialization): JD, Florida International University, 2019 BS Civil Engineering, University of South Alabama, 2007 <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Florida Professional Engineer – 75734 California – #78673 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.):