E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME: Rodney Devera, P.E. 13. ROLE IN THIS CONTRACT: Highway Design Roadway
<br />14. YEARS EXPERIENCE
<br />a. TOTAL:
<br />15
<br />b. WITH CURRENT FIRM:
<br />14
<br />15. FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126
<br />16. EDUCATION (Degree and Specialization):
<br />2004 Bachelor of Science in Civil Engineering, University of Central Florida
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Florida Professional Engineer – 71384
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): FDOT Advanced MOT Certification | FDOT Specifications
<br />19. RELEVANT PROJECTS
<br />
<br />
<br />
<br />
<br />
<br />a.
<br />(1) TITLE AND LOCATION (City and State) Roadways and Complete Infrastructure Improvements: Franjo Road (Design-Build) – Village of Palmetto Bay, FL
<br />YEARS COMPLETED
<br />PROFESSIONAL SERVICES
<br />ONGOING
<br />CONSTRUCTION
<br />ONGOING
<br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Manager responsible for the engineering design and permitting for the reconstruction of two existing roadways, which are Franjo Road
<br />from SW 184th Street (Eureka Drive) to south of US-1/South Dixie Highway and SW 180th Street from Franjo Road to SW 95th Avenue (Park
<br />Drive). The project also includes the construction of three new roads, SW 178th Street, SW 179th Street, and Park Drive. All of these roadways
<br />are part of the Village’s future Central Business District (CBD) and will be designed to be complete streets, including ADA compliant curb ramps,
<br />sidewalks, new bike lanes, new on-street parking, a new traffic circle at the intersection of Franjo Road and SW 181st Terrace and a pedestrian
<br />circle. Additional improvements include landscaping, decorative pavers, new water and sanitary sewer mains, stormwater management
<br />systems, underground utility relocations of FPL Distribution, AT&T and Comcast aerial facilities, reconstruction of damaged driveway aprons,
<br />new striping and paver crosswalks with the Palmetto Bay logo inset, new LED street lights, new street signage, new entryway signage, landscaped medians, clock tower, information kiosks, and street furnishings. Public involvement is also part the project.
<br />
<br />
<br />
<br />b.
<br />(1) TITLE AND LOCATION (City and State) Stock Island II Roadway Improvements – Key West, FL YEARS COMPLETED
<br />PROFESSIONAL SERVICES
<br />2010
<br />CONSTRUCTION
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Project Manager responsible for the engineering design and permitting. The improvements planned for MacDonald, Maloney, and Peninsular
<br />milling and resurfacing, road reconstruction, drainage improvements, sea level rise impact analysis, bike lanes, sidewalk repair, signing and pave
<br />with Disabilities Act (ADA) compliant sidewalk ramps, utility coordination and a new landscape median. The project also including coordination w part of their Small County Outreach Program (SCOP).
<br />
<br />
<br />
<br />c.
<br />(1) TITLE AND LOCATION (City and State) SW 72nd Avenue and SW 98th Street Traffic Circle - Village of Pinecrest YEARS COMPLETED
<br />PROFESSIONAL SERVICES
<br />2011
<br />CONSTRUCTION
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Project Manager and Engineer of Record responsible for the design of a new traffic circle. The traffic circle provides traffic calming at the
<br />intersection of two frequently used roadways in the Village of Pinecrest. The project includes roadway widening, milling and resurfacing,
<br />grading and new signing and pavement markings. Coordinated with permitting agencies, provided technical specifications and developed an engineering opinion of probable construction cost.
<br />
<br />
<br />d.
<br />(1) TITLE AND LOCATION (City and State) NW 41st Street from NW 79th Avenue to NW 87th Avenue – City of Doral YEARS COMPLETED
<br />PROFESSIONAL SERVICES
<br />2012
<br />CONSTRUCTION
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm
<br />Project Manager and Engineer of Record responsible for the design of widening an existing two-way roadway to include a left turn lane.
<br />Improvements also include a new sidewalk, stormwater management system, signing and pavement markings, lighting, utility coordination, landscaping, permitting as well as coordination with adjacent projects.
<br />
<br />
<br />
<br />
<br />e.
<br />(1) TITLE AND LOCATION (City and State) Commerce Lane Improvements – City of South Miami; South Miami, FL
<br />YEARS COMPLETED
<br />PROFESSIONAL SERVICES
<br />2011
<br />CONSTRUCTION
<br />2012
<br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Engineer of Record with responsibilities that include site layout, paving, grading, drainage, signage, pavement markings permitting and
<br />opinion of probable cost. This project includes improvements along the road from SW 68th Street to SW 70th Street.
<br />
<br />
<br />
<br />P- 45
|