Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME: Darren Dyer, PE Drainage 14. YEARS EXPERIENCE <br />a. TOTAL: 12 b. WITH CURRENT FIRM: 6 <br />15. FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 <br />16. EDUCATION (Degree and Specialization): <br />2006 Bachelor of Science in Civil Engineering, FIU, Miami, FL <br />2003 Bachelor of Science in Aerospace Engineering, UF, Gainesville, FL <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer: Florida – 73951 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): American Society of Civil Engineers <br />19. RELEVANT PROJECTS <br /> <br /> <br />a. <br />(1) TITLE AND LOCATION (City and State) I-95 (SR 9) at Gateway Boulevard Interchange Design, Boynton Beach, FL YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION <br />Unknown <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm <br />Drainage Engineer responsible for the development of a drainage report, plans production, drainage calculations and AdICPR model, as well as <br />hydraulic grade line calculations and drainage construction plans using GeoPak Drainage. <br /> <br /> <br /> <br />b. <br />(1) TITLE AND LOCATION (City and State) SR 710/Beeline Highway Widening Project, Martin County, FL YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION <br />2019 <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Drainage Project Engineer responsible for Major Strategic Intermodal System corridor project that involves reconstruction of an existing two-lane <br />facility to four-lane divided facility with concrete pavement and new open drainage system with linear dry detention ponds (swales). Responsible <br />for developing all conceptual and final design drainage deliverables, and obtaining all required environmental permit approvals, including a <br />South Florida Water Management District Environmental Resource Permit and United States Army Corps of Engineers Section 404 Dredge and <br />Fill Permit. <br /> <br /> <br />c. <br />(1) TITLE AND LOCATION (City and State) West Palm Beach Army Reserve Center, West Palm Beach, FL YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2014 <br />CONSTRUCTION <br />2018 <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Engineer responsible for drainage design, drainage report, and drainage plans for a new institutional site development. Responsible for <br />obtaining the SFWMD Standard General ERP, SFWMD Dewatering Permit, NPBCID Permit, and Palm Beach County Drainage Permit. <br /> <br /> <br /> <br />d. <br />(1) TITLE AND LOCATION (City and State) Stormwater Master Plan Update, Broward College (Central Campus), Davie, FL YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2012 <br />CONSTRUCTION <br />N/A <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm <br />Drainage Engineer responsible for hydrologic and hydraulic modeling of stormwater infrastructure within the campus. Project Tasks <br />include determination of the stormwater management level of service standards for the campus, to assess the current conditions and <br />what stormwater infrastructure is required to fulfill the requirements of the existing Stormwater Master Plan and to provide <br />recommendations for stormwater infrastructure based on future development within the campus. <br /> <br /> <br /> <br />e. <br />(1) TITLE AND LOCATION (City and State) Palm Avenue Roadway Improvements for Stirling Road to Griffin Road, Cooper City, FL <br />YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2011 <br />CONSTRUCTION <br />N/A <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Engineer responsible for Drainage Design (Roadway)/Site Development/Paving, Grading and Drainage. Responsible for drainage <br />analysis and hydrologic and hydraulic modeling, preparation of the drainage report and creation of drainage related plans for the roadway <br />improvements project. The project included a wet detention pond. <br /> <br /> <br />f. <br />(1) TITLE AND LOCATION (City and State) <br />City of Miami Stormwater Master Plan Update, Miami, FL <br />YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2010 <br />PROFESSIONAL SER <br />N/A <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Drainage Engineer responsible for hydrologic and hydraulic modeling of existing and future condition land uses, identification and ranking <br />of problem areas, evaluation of drainage projects under construction and projects under design for portions of the City of Miami. Tasks <br />involve evaluating available data, updating Stormwater Wastewater Management. Model (XP-SWMM), Version 8.2 models and utilizing <br />XP-SWMM models to assess existing and future models’ peak stages, flows, and volumes obtained. <br /> <br /> <br /> <br />P- 49