|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME: Darren Dyer, PE Drainage 14. YEARS EXPERIENCE
<br />a. TOTAL: 12 b. WITH CURRENT FIRM: 6
<br />15. FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126
<br />16. EDUCATION (Degree and Specialization):
<br />2006 Bachelor of Science in Civil Engineering, FIU, Miami, FL
<br />2003 Bachelor of Science in Aerospace Engineering, UF, Gainesville, FL
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer: Florida – 73951
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): American Society of Civil Engineers
<br />19. RELEVANT PROJECTS
<br />
<br />
<br />a.
<br />(1) TITLE AND LOCATION (City and State) I-95 (SR 9) at Gateway Boulevard Interchange Design, Boynton Beach, FL YEARS COMPLETED
<br />PROFESSIONAL SERVICES
<br />2019
<br />CONSTRUCTION
<br />Unknown
<br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm
<br />Drainage Engineer responsible for the development of a drainage report, plans production, drainage calculations and AdICPR model, as well as
<br />hydraulic grade line calculations and drainage construction plans using GeoPak Drainage.
<br />
<br />
<br />
<br />b.
<br />(1) TITLE AND LOCATION (City and State) SR 710/Beeline Highway Widening Project, Martin County, FL YEARS COMPLETED
<br />PROFESSIONAL SERVICES
<br />2019
<br />CONSTRUCTION
<br />2019
<br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Drainage Project Engineer responsible for Major Strategic Intermodal System corridor project that involves reconstruction of an existing two-lane
<br />facility to four-lane divided facility with concrete pavement and new open drainage system with linear dry detention ponds (swales). Responsible
<br />for developing all conceptual and final design drainage deliverables, and obtaining all required environmental permit approvals, including a
<br />South Florida Water Management District Environmental Resource Permit and United States Army Corps of Engineers Section 404 Dredge and
<br />Fill Permit.
<br />
<br />
<br />c.
<br />(1) TITLE AND LOCATION (City and State) West Palm Beach Army Reserve Center, West Palm Beach, FL YEARS COMPLETED
<br />PROFESSIONAL SERVICES
<br />2014
<br />CONSTRUCTION
<br />2018
<br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Engineer responsible for drainage design, drainage report, and drainage plans for a new institutional site development. Responsible for
<br />obtaining the SFWMD Standard General ERP, SFWMD Dewatering Permit, NPBCID Permit, and Palm Beach County Drainage Permit.
<br />
<br />
<br />
<br />d.
<br />(1) TITLE AND LOCATION (City and State) Stormwater Master Plan Update, Broward College (Central Campus), Davie, FL YEARS COMPLETED
<br />PROFESSIONAL SERVICES
<br />2012
<br />CONSTRUCTION
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm
<br />Drainage Engineer responsible for hydrologic and hydraulic modeling of stormwater infrastructure within the campus. Project Tasks
<br />include determination of the stormwater management level of service standards for the campus, to assess the current conditions and
<br />what stormwater infrastructure is required to fulfill the requirements of the existing Stormwater Master Plan and to provide
<br />recommendations for stormwater infrastructure based on future development within the campus.
<br />
<br />
<br />
<br />e.
<br />(1) TITLE AND LOCATION (City and State) Palm Avenue Roadway Improvements for Stirling Road to Griffin Road, Cooper City, FL
<br />YEARS COMPLETED
<br />PROFESSIONAL SERVICES
<br />2011
<br />CONSTRUCTION
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Engineer responsible for Drainage Design (Roadway)/Site Development/Paving, Grading and Drainage. Responsible for drainage
<br />analysis and hydrologic and hydraulic modeling, preparation of the drainage report and creation of drainage related plans for the roadway
<br />improvements project. The project included a wet detention pond.
<br />
<br />
<br />f.
<br />(1) TITLE AND LOCATION (City and State)
<br />City of Miami Stormwater Master Plan Update, Miami, FL
<br />YEARS COMPLETED
<br />PROFESSIONAL SERVICES
<br />2010
<br />PROFESSIONAL SER
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Drainage Engineer responsible for hydrologic and hydraulic modeling of existing and future condition land uses, identification and ranking
<br />of problem areas, evaluation of drainage projects under construction and projects under design for portions of the City of Miami. Tasks
<br />involve evaluating available data, updating Stormwater Wastewater Management. Model (XP-SWMM), Version 8.2 models and utilizing
<br />XP-SWMM models to assess existing and future models’ peak stages, flows, and volumes obtained.
<br />
<br />
<br />
<br />P- 49
|