My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EAC Consulting, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(19-11-01) Prof Eng and Arch Srvcs Ped Bridge REVISED
>
Responses
>
EAC Consulting, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 3:25:43 PM
Creation date
1/14/2020 3:23:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />NW South River Drive Improvements- Town of Medley, Florida <br />YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION <br />2017 <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Engineer of Record responsible for the design of lighting improvements on NW South River Drive in the Town of Medley. Our involvement <br />included the photometric and voltage drop analyses as well as the evaluation of LED lighting and coordination of load centers with the utility <br />power company. <br /> <br /> <br />b. <br />(1) TITLE AND LOCATION (City and State) Miami Dade Expressway Authority Systemwide Lighting Improvement Contract – Miami, Florida <br />YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2007 <br />CONSTRUCTION <br />2007 <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Manager for systemwide roadway improvements project. Included the replacement of aging secondary load centers, safety <br />improvements, installation of break-away pole bases and other system components to comply with current safety standards. <br /> <br />c. <br />(1) TITLE AND LOCATION (City and State) Widen NW 41St. Street from NW 79th to 87th Ave. – City of Doral, Florida YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2011 <br />CONSTRUCTION <br />2012 <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />The project consisted of widen NW 14th Street from a two-lane roadway to a two-lane roadway with a shared turning lane. The project <br />consisted of converting a roadway with a rural section to an urban section. Complete onsite drainage was required to meet the <br />requirements of the Miami-Dade County, Department of Environmental Resources Management (DERM). Mr. Borges was responsible <br />for reviewing voltage drop and photometric analyses, plans and QC the lighting plans. <br /> <br />d. <br />(1) TITLE AND LOCATION (City and State) SW 66th Street Roadway Improvements – City of South Miami, Florida <br /> <br />YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2010 <br /> CONSTRUCTION <br />2010 <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Engineer of Record responsible for the design of lighting improvements. Our involvement included the photometric and voltage drop analyses <br />for the installation of aesthetic lighting on SW 66th St. <br /> <br />e. <br />(1) TITLE AND LOCATION (City and State) SR-823 from Okeechobee Rd. to W. 18th Street – City of Hialeah, Florida <br /> <br />YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2011 <br /> CONSTRUCTION <br />2011 <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm <br />Engineer of Record responsible for the roadway lighting improvements on SR 823. The project extended from Okeechobee Rd. to W 18th <br />Street in the City of Hialeah. <br /> <br />f. <br />(1) TITLE AND LOCATION (City and State) <br />Miami Dade Expressway Authority Roadway Improvements on SR 836 by <br />NW 57th Ave. – Miami, Florida <br />YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2009 <br /> CONSTRUCTION <br />2009 <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Reviewed roadway lighting design as representative for MDX for compliance with contract documents, review of shop drawings and submittals. <br /> <br /> <br /> <br /> <br />2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME: Ramon Borges, PE 13. ROLE IN THIS CONTRACT: Senior Roadway Lighting Engineer <br />14. YEARS EXPERIENCE <br />a. TOTAL: <br /> 27 b. WITH CURRENT FIRM: 10 <br /> <br />15. FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 <br />16. EDUCATION (Degree and Specialization): BS – Electrical Engineering, University of Oriente, Cuba (1992) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer: Florida – 61622 <br /> <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): IMSA Fiber Optics for ITS Level I
The URL can be used to link to this page
Your browser does not support the video tag.