19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State) SR 968/SW 1 Street Bridge Maintenance of Traffic (MOT) Real Time Monitoring Pilot Project, FDOT District 6
<br />YEARS COMPLETED
<br />PROFESSIONAL SERVICES
<br />2014
<br />CONSTRUCTION
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm
<br />Project Manager responsible for developing a turnkey solution for this arterial traffic management concept. This project’s intent was to minimize
<br />delays and support additional traffic during the MOT phase along the detour route using TSM&O strategies such as real-time traffic monitoring
<br />using temporary closed-circuit television (CCTV) cameras; daily travel time data collection and analysis using temporary Wi-Fi devices; and
<br />temporary signal timing modifications at impacted signals along the detour route. Project also included coordination with Project CEI relating to
<br />MOT improvements and coordination with Miami-Dade County Traffic Signal staff for signal timing changes.
<br />
<br />b.
<br />(1) TITLE AND LOCATION (City and State) SR 826 Palmetto Expressway Segment 2 Project, FDOT District 6 YEARS COMPLETED
<br />PROFESSIONAL SERVICES
<br />2019
<br />CONSTRUCTION
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Senior ITS Engineer responsible for QA/QC of the ITS and Tolling Plans for this 1.5 mile segment Express Lanes corridor. Major ITS
<br />Project components include DMS, CCTV Cameras, MVDS, Ramp Signals, fiber optic cable and power distribution system.
<br />c.
<br />(1) TITLE AND LOCATION (City and State) SR 924/NW 119 Street ASCT Pilot Project, FDOT District 6 YEARS COMPLETED
<br />PROFESSIONAL SERVICES
<br />2015-2017
<br />CONSTRUCTION
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Project Manager responsible for overseeing the development of the Pilot Project procurement documents and lead owner’s
<br />representative for the deployment of an adaptive signal control system along NW 119 Street from eastern terminus of SR 924 Gratigny
<br />Parkway (west of NW 32 Avenue) to NW 5 Avenue (east of I-95) and along SR 9/NW 27 Avenue from NW 110 Street to NW 119 Street.
<br />This 3 mile and 15 signalized intersection corridor included next generation traffic signal controller’s upgrade, new video detection
<br />system, new fiber optic cable based communications system, among others. The project procurement documents included development
<br />of PSEMP, ConOps, Request for Proposal, Signalization concept plans, cost estimates, schedules and coordination activities.
<br />d.
<br />(1) TITLE AND LOCATION (City and State) SR 90/SW 8 Street Adaptive Signal Control Technology (ASCT) Pilot Project, FDOT District 6
<br />YEARS COMPLETED
<br />PROFESSIONAL SERVICES
<br />2015-2017
<br /> CONSTRUCTION
<br />2017
<br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm
<br />Project Manager responsible for developing the project procurement documents and lead owner’s representative for the deployment of an
<br />adaptive signal control system along SW 8 Street from SW 67 Avenue to SW 142 Avenue. The project procurement documents included
<br />development of a Project Systems Engineering Management Plan (PSEMP), Concept of Operations (ConOps), O&M Plan, Request for
<br />Proposal (RFP) and Minimum Technical Requirements. In addition, Girish supported in the development of the Project’s Evaluation Plan,
<br />Community Awareness Plans, Deployment Plans, and a Technical Plan for this Pilot Project. He also supported the Department in planning the
<br />performance metric dashboards for the Pilot Project.
<br />e.
<br />(1) TITLE AND LOCATION (City and State) TSM&O Program GEC Consultant, FDOT District 6 YEARS COMPLETED
<br />PROFESSIONAL SERVICES
<br />2012-2017
<br /> CONSTRUCTION
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm
<br />Senior Project Engineer involved in the development of numerous District 6 TSM&O Program initiatives such as the TSM&O Strategic Plan,
<br />TSM&O presentations and outreach material, District’s Core group meetings, Pilot Projects, etc. Multiple continuing initiatives included
<br />development of Monroe County Traffic Signal System ConOps and Implementation Plan, TSM&O Action Plan, Miami-Dade County Traffic
<br />Signal Maintenance Compensation Agreement (TSMCA) oversight support, Okeechobee Projects TSM&O deployments review oversight, etc.
<br />
<br />2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME: Girish Thallapragada, PE 13. ROLE IN THIS CONTRACT: Lighting
<br />14. YEARS EXPERIENCE
<br />a. TOTAL:
<br /> 18 b. WITH CURRENT FIRM: 2
<br />
<br />15. FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126
<br />16. EDUCATION (Degree and Specialization):
<br />2001 MS in Civil Engineering, Certified ITS Graduate
<br />Virginia Polytechnic Institute and State University
<br />2000 BS in Civil Engineering Andhra University