Laserfiche WebLink
19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) SR 968/SW 1 Street Bridge Maintenance of Traffic (MOT) Real Time Monitoring Pilot Project, FDOT District 6 <br />YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2014 <br />CONSTRUCTION <br />N/A <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm <br />Project Manager responsible for developing a turnkey solution for this arterial traffic management concept. This project’s intent was to minimize <br />delays and support additional traffic during the MOT phase along the detour route using TSM&O strategies such as real-time traffic monitoring <br />using temporary closed-circuit television (CCTV) cameras; daily travel time data collection and analysis using temporary Wi-Fi devices; and <br />temporary signal timing modifications at impacted signals along the detour route. Project also included coordination with Project CEI relating to <br />MOT improvements and coordination with Miami-Dade County Traffic Signal staff for signal timing changes. <br /> <br />b. <br />(1) TITLE AND LOCATION (City and State) SR 826 Palmetto Expressway Segment 2 Project, FDOT District 6 YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION <br />N/A <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Senior ITS Engineer responsible for QA/QC of the ITS and Tolling Plans for this 1.5 mile segment Express Lanes corridor. Major ITS <br />Project components include DMS, CCTV Cameras, MVDS, Ramp Signals, fiber optic cable and power distribution system. <br />c. <br />(1) TITLE AND LOCATION (City and State) SR 924/NW 119 Street ASCT Pilot Project, FDOT District 6 YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2015-2017 <br />CONSTRUCTION <br />N/A <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Project Manager responsible for overseeing the development of the Pilot Project procurement documents and lead owner’s <br />representative for the deployment of an adaptive signal control system along NW 119 Street from eastern terminus of SR 924 Gratigny <br />Parkway (west of NW 32 Avenue) to NW 5 Avenue (east of I-95) and along SR 9/NW 27 Avenue from NW 110 Street to NW 119 Street. <br />This 3 mile and 15 signalized intersection corridor included next generation traffic signal controller’s upgrade, new video detection <br />system, new fiber optic cable based communications system, among others. The project procurement documents included development <br />of PSEMP, ConOps, Request for Proposal, Signalization concept plans, cost estimates, schedules and coordination activities. <br />d. <br />(1) TITLE AND LOCATION (City and State) SR 90/SW 8 Street Adaptive Signal Control Technology (ASCT) Pilot Project, FDOT District 6 <br />YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2015-2017 <br /> CONSTRUCTION <br />2017 <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm <br />Project Manager responsible for developing the project procurement documents and lead owner’s representative for the deployment of an <br />adaptive signal control system along SW 8 Street from SW 67 Avenue to SW 142 Avenue. The project procurement documents included <br />development of a Project Systems Engineering Management Plan (PSEMP), Concept of Operations (ConOps), O&M Plan, Request for <br />Proposal (RFP) and Minimum Technical Requirements. In addition, Girish supported in the development of the Project’s Evaluation Plan, <br />Community Awareness Plans, Deployment Plans, and a Technical Plan for this Pilot Project. He also supported the Department in planning the <br />performance metric dashboards for the Pilot Project. <br />e. <br />(1) TITLE AND LOCATION (City and State) TSM&O Program GEC Consultant, FDOT District 6 YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2012-2017 <br /> CONSTRUCTION <br />N/A <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm <br />Senior Project Engineer involved in the development of numerous District 6 TSM&O Program initiatives such as the TSM&O Strategic Plan, <br />TSM&O presentations and outreach material, District’s Core group meetings, Pilot Projects, etc. Multiple continuing initiatives included <br />development of Monroe County Traffic Signal System ConOps and Implementation Plan, TSM&O Action Plan, Miami-Dade County Traffic <br />Signal Maintenance Compensation Agreement (TSMCA) oversight support, Okeechobee Projects TSM&O deployments review oversight, etc. <br /> <br />2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME: Girish Thallapragada, PE 13. ROLE IN THIS CONTRACT: Lighting <br />14. YEARS EXPERIENCE <br />a. TOTAL: <br /> 18 b. WITH CURRENT FIRM: 2 <br /> <br />15. FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 <br />16. EDUCATION (Degree and Specialization): <br />2001 MS in Civil Engineering, Certified ITS Graduate <br />Virginia Polytechnic Institute and State University <br />2000 BS in Civil Engineering Andhra University <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer: Florida – 73642; Texas - 101296 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.):