My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EAC Consulting, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(19-11-01) Prof Eng and Arch Srvcs Ped Bridge REVISED
>
Responses
>
EAC Consulting, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 3:25:43 PM
Creation date
1/14/2020 3:23:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) North Cruise Boulevard Lighting Design, Miami, Miami-Dade County, FL Port of Miami <br />YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />N/A <br />CONSTRUCTION <br /> <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm <br />Electrical designer for 0.7 miles of roadway and overpass bridge. Includes upgrading existing light poles with new Light Emitting Diode (LED), <br />upgrading new load center main and branch circuit breakers, circuit wire sizing and new underground conduits <br /> <br />b. <br />(1) TITLE AND LOCATION (City and State) City of Doral NW 41 Street Lighting Project YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />N/A <br />CONSTRUCTION <br /> <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm Electrical designer for 0.8 miles of roadway lighting on NW 41 Street between NW 79 Avenue and NW 87 Avenue. Includes upgrading <br />existing light poles with new Light Emitting Diode (LED). <br />c. <br />(1) TITLE AND LOCATION (City and State) Traffic Management Center (TMC) Support Engineer, Miami-Dade County, FL-FDOT District 6 <br />YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />N/A <br />CONSTRUCTION <br /> <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm <br />Provided assessment and electrical design services to modify the Traffic Management Center (TMC) with added electrical infrastructure to support <br />the 2nd floor Florida Highway Patrol (FHP) TMC operations. This included load monitoring and data analysis of existing power distribution equipment <br />within the TMC network room to determine if the additional FHP loads could be added to the existing Power Distribution Equipment (PDU). Review of <br />the existing branch circuits within <br />d. <br />(1) TITLE AND LOCATION (City and State) Statewide Telecommunications Integration - (ITS) Wide Area Network (WAN) <br />Deployment | Miami-Dade County, FL, - FDOT District 4 & 6 <br />YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />N/A <br /> CONSTRUCTION <br /> <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Under PB Farradyne and Telvent, provided electrical designs to integrate FDOT’s Intelligent Transportation System (ITS) Wide Area Network <br />(WAN) which provides connectivity throughout the state by utilizing the statewide microwave system to connect the Regional Transportation <br />Management Centers (RTMC) across the state. This project added network equipment into existing racks at District 4 and 6 to connect to <br />existing RTMCs in Districts 2 and 5. This work included assessing existing loads and branch circuits available at the District 4 and 6 Traffic <br />Management Center (TMC) and added the necessary electric branch circuits and breakers at panel boards within these TMC to accommodate <br />the network equipment. Project also included modifications of FDOT sites between Miami-Dade and Orange County, along the Florida Turnpike <br />to add necessary network equipment to facilitate connectivity to District 5, as well as FDOT sites to connect to District 2. <br />e. <br />(1) TITLE AND LOCATION (City and State) Dodge Island North Cruise Boulevard Roadway Lighting Design | Miami-Dade County, FL <br />YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />N/A <br /> CONSTRUCTION <br /> <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm <br />ITS Engineer Under PB Farradyne provided electrical power distribution design for two miles of roadway lighting at the Port of Miami Dodge <br />Island, along North Cruise Boulevard previously called Eastern Port Boulevard, and provided utility power coordination with Florida Power & <br />Light Company. <br />STANDARD FORM 330 (REV. 3/2013) PAGE 2 <br /> <br />2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME: Richard Lopez 13. ROLE IN THIS CONTRACT: Lighting <br />14. YEARS EXPERIENCE <br />a. TOTAL: 37 b. WITH CURRENT FIRM: <br />3 <br /> <br />15. FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 <br />16. EDUCATION (Degree and Specialization): 1981 - Bachelor of Science in Electrical Engineering - University of Miami 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) N/A <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): Association of Energy Engineers-Member, Electrical <br />Power Research Institute-Member, Institute of Electrical and Electronics Engineers-Member, National Fire Protection Association-Member, Quality <br />Magazine Advisory Board-Member, South Florida Association of Engineers-Member. Certified Energy Manager.
The URL can be used to link to this page
Your browser does not support the video tag.