My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EAC Consulting, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(19-11-01) Prof Eng and Arch Srvcs Ped Bridge REVISED
>
Responses
>
EAC Consulting, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 3:25:43 PM
Creation date
1/14/2020 3:23:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY NUMBER <br />7 <br />21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED <br />41st Street Bridge <br />Miami Beach, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2003-2005 2005 <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT EMAIL ADDRESS <br />City of Miami Beach Ira Giller (Owner’s Rep)ira@gillerandgiller.com <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (include scope, size, and cost) <br />The design concept is based on the importance of 41st Street as a diverse community center and major gateway into the heart of Miami Beach. <br />The goal was to transform the street into a tropical cosmopolitan “boulevard,” based on 41st Street’s unique geographic location and particular <br />functions. The design called for a sequence of spatial experiences, or “events,” which were linked together by Royal Palms, flowering shrubs, and <br />groundcovers. A landscape median was proposed for the length of the street, with new decorative paving for all sidewalks. A major element of the <br />plan was the redesign of the Indian Creek Bridge, calling for wider sidewalks, benches, planters, and a pavilion lighthouse, acting as a gateway to <br />the street. <br />Location: Miami Beach, FL <br />Service: Master Plan, Schematic Plans, Design Development, Construction Administration <br />Principal Firm: Consul-Tech Engineering <br />Date:2005 <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE <br />Savino & Miller Design Studio, PA 12345 NE 6th Avenue, North Miami, FL 33161 Landscape Architect <br />b.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE <br />c.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE
The URL can be used to link to this page
Your browser does not support the video tag.