My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hardesty & Hanover
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(19-11-01) Prof Eng and Arch Srvcs Ped Bridge REVISED
>
Responses
>
Hardesty & Hanover
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 3:56:17 PM
Creation date
1/14/2020 3:49:08 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
391
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />FDOT Process <br />The FDOT Florida Design Manual (FDM) has been <br />updated for 2020 with the stipulations for Review <br />of Non-Department-Owned Projects in new <br />construction (Article 121.18 shown to right). This <br />update establishes the review requirements for <br />non-department-owned projects crossing <br />Department-owned right-of-way. The Bridge Park <br />does not cross an NHS facility and will therefore not <br />require FHWA approval. <br />H&H’s Category 1 structural system <br />streamlines the review process since it only <br />requires review from the District Structures <br />Design Office (DSDO) and not the State <br />Design Office (SDO). <br /> <br />Bridge Park Project Process <br />H&H’s Bridge Park Project Process, presented on the following foldout, outlines the project delivery <br />phases from Project Initiation through Post-Design/Construction. <br /> <br />H&H is one of the premier bridge design firms in the state and has been trusted with some the FDOT’s <br />most complex bridge replacement projects. Below is a listing of FDOT bridge replacement projects in the <br />past decade and their status in the FDOT process: <br />1. SFRC over Miami Canal FDOT D6 Initial Design <br />2. SW 1St Street over Miami River FDOT D6 Post Design - Construction <br />3. NW 5th Street over Miami River FDOT D6 Complete <br />4. HEFT Ramp H4 FDOT D6 Complete <br />5. HEFT Ramp H5 FDOT D6 Complete <br />6. Flagler Memorial over ICWW FDOT D4 Complete <br />7. North Bridge over ICWW FDOT D4 Final Design - Constructability Phase <br />8. Jupiter Federal over ICWW FDOT D4 Final Design - Constructability Phase <br />9. Pembroke Rd over I-75 FDOT D4 Complete <br />10. Miramar Over I-75 FDOT D4 Complete <br />11. CSX over New River FDOT D4 Complete <br />12. Little Ringling over Sarasota Bay FDOT D1 PD&E <br />13. SR 50 over I-75 FDOT D7 Complete <br />14. I-4 CD over Bypass Canal FDOT D7 Initial Design <br />15. SR 77 over SR 75 FDOT D3 Final Design - Biddability Phase <br />2020 FDOT Florida Design Manual Excerpt <br />D-4
The URL can be used to link to this page
Your browser does not support the video tag.