Laserfiche WebLink
Post -DesignProject Initiation Initial <br />Engineering Production <br />Initial Engineering Phase <br />•Design Criteria <br />•Typical Section Package <br />•Variations and Exceptions <br />•Pavement Design <br />Package <br />•Initial Bridge <br />Development Report <br />(BDR) <br />•Permit Involvement Form <br />(PIF) <br />•Conceptual Drainage <br />Report <br />•LRE Update/Scope <br />History <br />•R/W Coordination <br />Plans Submittal <br />•30% Roadway Plans <br />•BDR / 30% Bridge Plans <br />Constructability Phase <br />•Permits Required Memo <br />(PRM) <br />•Final BDR Approved <br />•Approved Typical Section <br />Package & Pavement <br />Design <br />•Utility Design Conference <br />•Cost Estimate / LRE <br />•Permits Pre-Application <br />Meeting <br />•Pay Items in <br />AASHTOWARE <br />•R/W Mapping <br />•Public Workshop <br />•Final Drainage Report <br />•Final Geotechnical Report <br />Biddability Phase <br />•Outdoor Advertisement <br />(ODA) Clear Letter <br />•Permits Transmittal <br />Memo <br />•Railroad Clear Letter <br />•Utility Work Schedules <br />•Utility Certification <br />Memo <br />•PS&E Field Review <br />•Quantities <br />•Modified & Technical <br />Special Provisions <br />•Engineer's Cost Estimate <br />•Construction Days <br />Estimate <br />Plans Submittal: <br />•90% Roadway Plans <br />•90% Bridge Plans <br />Post Design <br />• Pre-Construction Meeting <br />• Design Support <br />• RFIs <br />• Plan Revisions <br />• Shop Drawing Review <br />• Field Review <br />Project Scoping <br />•Scope Clarification <br />• Staff Hour/Fee Estimate <br />Notice to Proceed <br />• Project Kick-off Meeting <br />• Schedule Discovery <br />• QA/QC Plan <br />• Initial Community <br />Awareness Plan (CAP) <br />• Validate Long Range <br />Estimate (LRE) <br />• Utility Kick-Off Meeting <br />Data Collection <br />• Survey <br />• Geotechnical <br />• Environmental <br />• UAO Plans & Markups <br />Production Phase <br />•Pre-Production Meeting <br />•Construction Time <br />Estimate (CTE) Memo <br />•Final Cost Estimate <br />•Contamination Impact <br />Certification <br />•Permits Issued <br />•Environmental <br />Certification <br />•R/W Certification <br />•Specifications Package <br />•Letting <br />•Pre-Bid Meeting <br />•Unbalanced Bid Review <br />Plans Submittal: <br />• Final Plans <br />• CADD (Digital Delivery) <br />Final <br />Engineering <br />Plans Submittal <br />•60% Roadway Plans <br />•60% Bridge Plans <br />Bridge Park Project Production Process