Laserfiche WebLink
<br />APPROACH TO PROJECT ISSUES <br />Each of the numerous bridges successfully delivered by H&H had unique challenges. Our proven bridge <br />project delivery methodology includes an integrated design approach which considers function, design <br />parameters, and constructability at each step. We innovate wherever it is advantageous to bring value to <br />each project using practical techniques – innovation; not experimentation. <br />Key strategies to successfully deliver the Bridge Park project include: <br />Use of structurally redundant systems <br /> <br />Use of durable materials and systems <br /> <br />Integration of function, design, and constructability <br /> <br />Planning and execution of FDOT and City processes <br /> <br />SITE & GEOMETRIC CONSTRAINTS <br />From our site visits and our understanding of bridge development processes, we have identified the <br />following site and geometric constraints: <br />Roadway <br />At this location, Collins Avenue is a State-owned 6-lane median <br />separated non-SIS Urban Principal Arterial with a posted speed <br />limit of 35 mph. Sidewalks on either side of the roadway are <br />heavily travelled by pedestrians. <br />Lateral offset <br />The bridge piers need to be placed 16 feet clear of the travel lanes <br />(FDOT FDM Table 215.2.2). <br />Bridge Vertical Clearance <br />The minimum new bridge vertical clearance over Collins Avenue <br />is 17.5 feet (FDOT FDM Table 260.6.1). The clearance needs to <br />include a horizontally-mounted signal head resulting in a bridge <br />low member clearance of 20 feet. <br />Right-of-Way/Easements <br />The Combined Easement Plan image shows the three easements already acquired from the Winston <br />Towers property on the west side of Collins Avenue. The right-of-way line is the back of sidewalk along <br />174th Street and Collins Avenue. The permanent easement is a 40 x 60 foot area (blue) with a temporary <br />construction easement (grey) on the west and south side. There is a 12 foot utility easement strip (orange) <br />to the north approaching 174th Street. <br />Combined Easement Plan <br />Icons are placed throughout <br />document to underscore the <br />key strategies. <br />D-6