Laserfiche WebLink
<br />Utilities <br />The primary objective of the utility coordination process is to identify and <br />resolve all known utility conflicts and reduce the risk to the Bridge Park <br />schedule and budget. F.R. Aleman possesses a vast knowledge of the <br />requirements, issues, and processes associated with the coordination and <br />disposition of utilities during the design process. This knowledge avoids <br />delays associated with conflicts. <br />According to Sunshine State One-Call Report (as tabulated below) and <br />our preliminary utility outreach, 12 utilities have been identified as <br />being present within the project boundaries. These utilities include <br />overhead joint use electric, underground electric, water, gas, sanitary, <br />underground telephone, and fiber optic facilities. County and several local <br />agencies acknowledged the following facilities: Sunny Isles Beach; Atlantic <br />Broadband; Miami-Dade County Public Works, Traffic and Water & Sewer <br />Departments; Crown Castle Fiber; Hotwire Communications; MCI; North <br />Miami Beach Water/Jacobs; Crown Castle NG; Teco Peoples Gas South <br />Florida; AT&T/Distribution; and FPL Transmission. <br />Sunshine State One-Call Data <br />D-7