Laserfiche WebLink
STANDARD FORM 330 (REV. 3/2013) PAGE 2 <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete on Section E for each key person) <br />12. NAME <br />Ronald Sanchez, PE <br />13. ROLE IN THIS CONTRACT <br />Assistant Project Manager / Structural Engineer <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />20 b. WITH CURRENT FIRM <br />18 <br />15. FIRM NAME AND LOCATION (City and State) <br />HARDESTY & HANOVER (Sunrise, FL) <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />B.S. / Civil Engineering / Manhattan College <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Professional Engineer: FL <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Ronald Sanchez has over 20 years of professional engineering experience. As a Project Manager and Structural Engineer, Ron is <br />responsible for studies, design, and inspection of fixed and movable bridges. He is recognized for his knowledge of the technical <br />details and coordination requirements associated with multi‐disciplined bridge projects. <br />19. RELEVANT PROJECTS <br />TITLE AND LOCATION (City/State); BRIEF DESCRIPTION (scope, size, cost, etc.); ROLE <br />SR A1A NORTH CAUSEWAY BRIDGE over ICWW <br />Fort Pierce, FL <br />Project Manager. Responsible for responsible for overseeing the engineering design services for the replacement of SR-A1A North <br />Causeway Bridge. Scope of services includes the alignment, segmental bridge super and substructure design, drainage, MOT, ITS, <br />geotechnical, hydrogeology, lighting, signalization, signage, paving marking, utility/railroad/marine coordination, permitting, public <br />involvement, maintenance, control and protection of vehicular and marine traffic, as well as additional roadway design services which <br />addresses adjacent state, frontage and access roads, and railway crossings affected by the project. <br />ENGINEERING COMPLETED <br />2021 <br />CONSTRUCTION COMPLETED <br />n/a <br /> Check if project performed with current firm <br />TITLE AND LOCATION (City/State); BRIEF DESCRIPTION (scope, size, cost, etc.); ROLE <br />SR 826 / SUNNY ISLES BRIDGE over the ICCW <br />Sunny Isles Beach, FL <br />Project Manager. Responsible for providing comprehensive engineering services for the Rehabilitation of the Sunny Isles Bridge over the <br />ICWW. Services included Bridge Development Report (BDR) and bridge design services involving mechanical/ electrical systems, steel <br />painting, deck grating replacement with wheel paths, vibration study of the control house, public involvement; permitting, TCP plans, <br />roadway, drainage, signing and pavement markings analysis and plans, and construction cost estimates. This design project will add <br />bicycle lanes on Sunny Isles Boulevard, from SR A1A to NE 35th Avenue, and include the addition of special safety details on the <br />bascule grating. Traffic control plans involve a crossover geometry which required our team to coordinate with the City of Sunny Isles <br />Beach to limit impacts to a City park and associated hardscape. <br />ENGINEERING COMPLETED <br />Est. 6/2021 <br />CONSTRUCTION COMPLETED <br />n/a <br /> Check if project performed with current firm <br />TITLE AND LOCATION (City/State); BRIEF DESCRIPTION (scope, size, cost, etc.); ROLE <br />GASAPARILLA ISLAND SWING BRIDGE over Gulf ICWW <br />Placida, FL <br />Project Engineer. Responsible for the development of structural alternatives, their feasibility, and associated cost estimates for the <br />design study for the replacement of a 248-foot swing-span bridge. Services included inspection of the structural, mechanical and <br />electrical systems and development of rehabilitation and replacement options (swing and bascule span) with conceptual drawings, <br />alignments, and cost estimates. Also responsible for structural design for the replacement of a 220-foot swing-span bridge. Project <br />consisted of 678-foot of new bridge with a 250-foot deck girder swing-span and approach spans utilizing Florida I-Beams. <br />Embankments were supported by MSE walls and protected by new bulkheads and revetment. In addition to the bridge structures, a <br />new pile-supported tender house was included. <br />ENGINEERING COMPLETED <br />2013 <br />CONSTRUCTION COMPLETED <br />n/a <br /> Check if project performed with current firm <br />TITLE AND LOCATION (City/State); BRIEF DESCRIPTION (scope, size, cost, etc.); ROLE <br />COCONUT ISLE BRIDGE <br />Fort Lauderdale, FL <br />Project Manager. Responsible providing a Bridge Alternative Study and engineering design services for the replacement of a single- <br />span fixed concrete replacement bridge for an Isles of Las Olas residential community. Scope of work includes permitting, geotechnical <br />investigation, load rating, drainage, utility coordination, bridge bulkhead wall design, temporary bridge, maintenance of traffic, public <br />involvement support as well as bid-phase and post-design services. <br />ENGINEERING COMPLETED <br />2020 <br />CONSTRUCTION COMPLETED <br />n/a <br /> Check if project performed with current firm <br />TITLE AND LOCATION (City/State); BRIEF DESCRIPTION (scope, size, cost, etc.); ROLE <br />SR 7 / NW 5TH STREET BRIDGE over the MIAMI RIVER <br />Miami, FL <br />Structural Engineer. Responsible for responsible for bascule pier and footing design consisting of 30-foot-deep cofferdam, 30-square- <br />inch prestressed piles, AASHTO LRFD loads including vessel collision, steel trunnion towers and access platforms, stairs, door, and <br />hatches. Design of a new $50 million double-leaf bascule bridge used the appearance of a deck truss Chicago-style trunnion bascule <br />span to fit in with the historic and aesthetic character of Miami’s Little Havana community. Project included greenway Riverwalk, control <br />tower, and approach roadways designs. <br />ENGINEERING COMPLETED <br />2010 <br />CONSTRUCTION COMPLETED <br />n/a <br /> Check if project performed with current firm <br />