Laserfiche WebLink
STANDARD FORM 330 (REV. 3/2013) PAGE 2 <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete on Section E for each key person) <br />12. NAME <br />Steven Nappi, PE <br />13. ROLE IN THIS CONTRACT <br />Constructibility and Construction Bid / <br />Administration / Inspections <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />14 b. WITH CURRENT FIRM <br />1 <br />15. FIRM NAME AND LOCATION (City and State) <br />HARDESTY & HANOVER (Tampa, FL) <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />B.S. / Engineering; Minor-Structural Engineering and Mathematics / Roger <br />Williams University <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND <br />DISCIPLINE) <br />Professional Engineer: FL <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Steven Nappi has extensive experience in managing and administering road and bridge construction projects for the FDOT. He has <br />earned his FDOT Advanced MOT and Critical Structures Construction Issues (SSC) certifications. With a strong background in structural <br />engineering, he has had roles as FDOT Project Administrator/Project Manager and CEI PE/SPE on ten Florida bridge contracts. <br />19. RELEVANT PROJECTS <br />TITLE AND LOCATION (City/State); BRIEF DESCRIPTION (scope, size, cost, etc.); ROLE <br />BOCA GRANDE CAUSEWAY BRIDGE REPLACEMENT <br />Fort Lauderdale, FL <br />Swing Span Project Engineer. Responsible for all construction and administrative aspects of the bridge construction which included review <br />of contract documents and shop drawings, coordinating field inspection of structural, mechanical and electrical components, assisting in <br />preparation of progress pay estimates, updating shop drawing submittal logs, final as-builts, computation books and pay item <br />overruns/underruns, and reviewing daily reports of construction. The project required the replacement of a structurally deficient swing <br />span bridge located on the Boca Grande Causeway. Total bridge replacement length is 678 feet, included is a 219-foot swing span. <br />ENGINEERING COMPLETED <br />2016 <br />CONSTRUCTION COMPLETED <br />n/a <br /> Check if project performed with current firm <br />TITLE AND LOCATION (City/State); BRIEF DESCRIPTION (scope, size, cost, etc.); ROLE <br />CR 78 (Pine Island Road) MATLACHA BRIDGE REPLACEMENT <br />Lee County, FL <br />Project Engineer. Responsible for preparing agendas for progress meetings and recording minutes; preparing CPPR, holiday and <br />weather letters; reviewing and approving estimates, tracking claims; shop drawing submittal logs, concrete lots, and pay item <br />overruns/underruns; updating/signing & sealing final as-builts; updating the computation book; and reviewing daily reports of <br />construction. This 675-foot-long, $17.3M bascule bridge replacement project includes reconfiguration of the roadway approaches, new <br />bulkhead seawalls, and storm drainage collection and treatment system. <br />ENGINEERING COMPLETED <br />2013 <br />CONSTRUCTION COMPLETED <br />n/a <br /> Check if project performed with current firm <br />TITLE AND LOCATION (City/State); BRIEF DESCRIPTION (scope, size, cost, etc.); ROLE <br />WHITE BOULEVARD OVER CYPRESS CANAL BRIDGE REPLACEMENT <br />Bonita Springs, FL <br />Senior Project Engineer. Responsible for all construction and administrative aspects which includes reviewing contract documents, holding <br />meetings, preparing progress pay estimates, change orders and the final estimate package, reviewing/approving shop drawings, <br />updating submittal logs, preparing/signing and sealing the final as-builts, monitoring field activities, and reviewing daily construction <br />reports; monitoring the material testing program and pile driving operations, resolved issues in the field, advised where to look for <br />requirements when inspecting different aspects of the work, performed depth checks during the Bidwell dry run and during concrete <br />placement for deck pours, inspected rebar placement, ensured all permanent works were installed in accordance with contract <br />documents. This project required the replacement of the structurally obsolete bridge and the resurfacing/reconstructing of the roadway <br />approaches. The new bridge, founded on 18-inch square piles with CIP caps and a 1.5 foot CIP deck, accommodates 12-foot travel <br />lanes, 5.5-foot shoulders and 6.5-foot sidewalks. Limited right-of-way necessitated the purchase of temporary/permanent easements <br />so a temporary bridge could be installed. Significant utility relocations required moving overhead electric/communication lines and the <br />replacing raw water main which serves 80% of the County’s customers. <br />ENGINEERING COMPLETED <br />2016 <br />CONSTRUCTION COMPLETED <br />n/a <br /> Check if project performed with current firm <br />TITLE AND LOCATION (City/State); BRIEF DESCRIPTION (scope, size, cost, etc.); ROLE <br />VANDERBILT DRIVE BRIDGE REPLACEMENT <br />Bonita Springs, FL <br />Senior Project Engineer. Responsible for all construction and administrative aspects which includes reviewing contract documents, holding <br />meetings, preparing progress pay estimates, change orders and the final estimate package, reviewing/approving shop drawings, <br />updating submittal logs, preparing/signing and sealing the final as-builts, monitoring field activities, and reviewing daily construction <br />reports; monitoring the material testing program and pile driving operations, resolved issues in the field, advised where to look for <br />requirements when inspecting different aspects of the work, performed depth checks during the Bidwell dry run and during concrete <br />placement for deck pours, inspected rebar placement, ensured all permanent works were installed in accordance with contract <br />documents during construction. The Vanderbilt Drive bridge featured a main span of 176 feet between trunnions. The structural system <br />included two main longitudinal plate girders, a composite Exodermic deck system featuring a lightweight concrete riding surface and a <br />steel box counterweight. <br />ENGINEERING COMPLETED <br />2018 <br />CONSTRUCTION COMPLETED <br />n/a <br /> Check if project performed with current firm