My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hardesty & Hanover
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(19-11-01) Prof Eng and Arch Srvcs Ped Bridge REVISED
>
Responses
>
Hardesty & Hanover
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 3:56:17 PM
Creation date
1/14/2020 3:49:08 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
391
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) PAGE 4 <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br />NUMBER 1 <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />MDC/Department of Transportation and Public Works Snowden Pedestrian Bridge <br />along Commodore Trail adjacent to Bridge 874293 <br />PROFESSIONAL SERVICES <br />On-Going <br />CONSTRUCTION (if appl.) <br /> <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER <br />Miami-Dade County <br />b. POINT OF CONTACT NAME <br />Adrian Robaina, Pedelta <br /> <br />c. POINT OF CONTACT TELEPHONE <br />NO. <br />305-648-0010 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br />This project consists of the construction of a new prefabricated pedestrian bridge spanning across the C-100 <br />canal along Old Cutler Trail between SW 173 and 174 Street in the Village of Palmetto Bay. The bridge is <br />intended to carry pedestrian traffic traveling along the Old Cutler Trail and will be adjacent to the existing <br />bridge along Old Cutler Road. Construction is anticipated to begin in Summer 2020. Contract: $34,880.11 (PI <br />Fee) <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME <br />Media Relations Group <br />(2) FIRM LOCATION (City and State) <br />Miami, FL <br />(3) ROLE <br />Public Involvement <br />b. <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />c. <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />d. <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />e. <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />f. <br />(1) FIRM NAME <br /> <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br />
The URL can be used to link to this page
Your browser does not support the video tag.