My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hardesty & Hanover
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(19-11-01) Prof Eng and Arch Srvcs Ped Bridge REVISED
>
Responses
>
Hardesty & Hanover
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 3:56:17 PM
Creation date
1/14/2020 3:49:08 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
391
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Transverse Structural System (Ribs) <br />The Bridge Park requires elevation differences for the upper and lower levels (See Bridge Park Concept <br />Typical Section). Transverse rib elements will be made continuous across the bridge section with <br />reinforcing steel passing through the spine webs. The ribs consist of cast-in-place concrete diaphragms <br />within and between FUBs and precast concrete cantilever brackets will extend from the spine. The bottom <br />elevation of these transverse members will be one-foot four-inches above the bottom of the FUB to avoid <br />conflict with any prestressing strands. Ribs are redundant with multiple load paths provided by <br />continuous slabs and edge wall systems. <br /> <br />72-inch FDOT Standard Florida U Beam (FUB 72) <br />H&H-Designed Johnson Street Bridge with Rib Elements Supporting Pedestrian Walkway <br />D-15
The URL can be used to link to this page
Your browser does not support the video tag.