Laserfiche WebLink
<br />Spine Erection <br />Employing H&H’s innovative approach to beam delivery, the FUBs can be trucked and erected with <br />only single night road closures to Collins Avenue. The erection of FUB spines is a common and <br />conventional construction operation. The prestressed FUBs do not require any additional <br />strengthening to carry the final design loads. Traffic can resume normal patterns once each beam is <br />braced temporary lateral bracing. <br /> <br /> <br />The picture above shows the erection of a 150 foot-long, 175-ton custom arched prestressed beams being <br />erected after being delivered from Tampa by barge at the H&H-designed Flagler Memorial Bridge in Palm <br />Beach. <br /> <br />H&H-Designed Flagler Memorial Bridge: Beam Erection <br /> <br />D-21