My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hardesty & Hanover
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(19-11-01) Prof Eng and Arch Srvcs Ped Bridge REVISED
>
Responses
>
Hardesty & Hanover
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 3:56:17 PM
Creation date
1/14/2020 3:49:08 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
391
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ROADWAY MODIFICATION <br />There will be roadway modifications required <br />including sidewalk modifications, curb return <br />and ADA upgrades, median revisions to <br />discourage jay walking, as well as, the temporary <br />demolition and reconstruction of the median to <br />accommodate the temporary traffic control <br />phases. The current median roadway geometry <br />allows for a comfortable U-Turn. <br />SIGNALS <br />Bridge mounted traffic signal heads will be <br />provided since the existing signal at 174th Street <br />will be obstructed by the new bridge. Miami- <br />Dade County only allows traffic signals to be <br />installed horizontally. A 17.5-foot vertical <br />clearance to the signal head is required. All signal <br />plans will be submitted to FDOT and Miami-Dade <br />County for approval. <br /> <br />Median on Collins Ave at 174th St <br />Signals at 174th St <br />D-26
The URL can be used to link to this page
Your browser does not support the video tag.