|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />GREGORY S. STEVENS, P.E.
<br />13. ROLE IN THIS CONTRACT
<br />Geotechnical Project Manager
<br />14. YEARS EXPERIENCE
<br />a.TOTAL
<br />15
<br />b. WITH CURRENT FIRM
<br />1
<br />15. FIRM NAME AND LOCATION (City and State)
<br />MASER CONSULTING, INC. – Tampa, FL
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />BS, Civil Engineering, University of Central
<br />Florida, 2005
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Professional Engineer, Florida License No. 71511
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Professional Affiliations: Member – American Society of Civil Engineers (ASCE); Florida Engineering Society (FES)
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1)TITLE AND LOCATION (City and State)
<br />Manatee County (Florida) Continuing Services Contract
<br />Manatee County, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2019
<br />CONSTRUCTION (If Applicable)
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm
<br />Senior project Engineer for geotechnical exploration and evaluation, and Responsible Engineer in Charge of QC
<br />testing (Construction Materials Testing - CMT) – Served on multiple projects for varying purposes and roles for the
<br />County. A small selection of these projects is included below:
<br />•Geotechnical Exploration and Recommendation Project Examples: Tara 20 Force Main Pipeline Design, Force Main
<br />5 Pipeline Design, G.T. Bray Park Field Improvements, South West Water Treatment Plant Ramp Design, John H.
<br />Marble Park Improvements and Blackstone Park Improvements
<br />•CMT (QC) Testing Management Project Examples: Tara 20 Force Main Pipeline Installation, Force Main 5 Pipeline
<br />Installation, Robinson Preserve Expansion Construction, Force Main 11 Installation, Mulholland Road Water Main
<br />Installation and Fort Hamer Park Improvements Construction
<br />b.
<br />(1)TITLE AND LOCATION (City and State)
<br />Sarasota County (Florida) Continuing Services Contract
<br />Sarasota County, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2019
<br />CONSTRUCTION (If Applicable)
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm
<br />Senior project engineer for geotechnical exploration and evaluation, and Responsible Engineer in Charge of CMT
<br />testing. A small selection of these projects is included below: Various Park Lighting Projects – Geotechnical
<br />exploration and recommendations for multiple foundations at each of several field lighting projects
<br />•Siesta Key Pipeline – Forensic geotechnical evaluation and monitoring during construction of piezometric pressures
<br />adjacent to the pipeline
<br />•Snook Haven Improvements – Geotechnical exploration and recommendations for proposed building foundations
<br />•Ed Smith Stadium – Forensic geotechnical evaluation of outfield restroom structure issues and general remediation
<br />recommendations
<br />c.
<br />(1)TITLE AND LOCATION (City and State)
<br />Charlotte County Utilities Continuing Services Contract
<br />Charlotte County, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018
<br />CONSTRUCTION (If Applicable)
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm
<br />Provided CMT testing management of a multitude of emergency pavement repair testing projects, primarily for utility
<br />breaks.
<br />d.
<br />(1)TITLE AND LOCATION (City and State)
<br />FDOT District 1 Continuing Services Contract
<br />Multiple Counties, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018
<br />CONSTRUCTION (If Applicable)
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm
<br />Provided Geotechnical exploration and recommendations for a number of roadway projects, traffic light replacement
<br />projects, and box culvert replacements. Also provided pavement coring for a number of pavement resurfacing/repair
<br />projects.
<br />e.
<br />(1)TITLE AND LOCATION (City and State)
<br />Legacy Trail Pedestrian Bridge over Laurel Road
<br />Venice/Sarasota, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2015
<br />CONSTRUCTION (If Applicable)
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm
<br />Scope of services included geotechnical explorations with SPT borings, CPT soundings, standard laboratory index
<br />tests and consolidation tests. Developed geotechnical analyses, including shallow foundation settlement analyses for
<br />the Legacy Trail Bridge using Settle 3D and other methods, and provided results of the exploration and analyses to
<br />the Department in a technical report signed and sealed by Mr. Stevens.
<br />Section E, Page 29
|