|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />JEFFREY TUCHBAND
<br />13. ROLE IN THIS CONTRACT
<br />GIS / Survey Manager
<br />14. YEARS EXPERIENCE
<br />a.TOTAL
<br />28
<br />b. WITH CURRENT FIRM
<br />15
<br />15. FIRM NAME AND LOCATION (City and State)
<br />MASER CONSULTING P.A. – Miami, FL
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />University of Florida, Texarkana College AutoCAD,
<br />Mastering Today's AutoCAD, MicroStation Training
<br />CADD Centers of Florida
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Professional Affiliations: FSMS Miami-Dade Chapter Member, AutoCAD User Group International, Florida Users
<br />Group FDOT, The MicroStation Community User Group, Green Builders Coalition.
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1)TITLE AND LOCATION (City and State)
<br />Phillip and Patricia Frost Science Museum
<br />Miami-Dade County, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2017
<br />CONSTRUCTION (If Applicable)
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm
<br />Produced a final survey for the project was a Topographic or Design Survey for the areas outside the property lines
<br />or within the right of way of the adjacent public streets. The field work performed included a high definition 3D scan
<br />of the full corridor beginning 500 feet south of the NE 11th Street intersection continuing north, under the 836 East-
<br />West Expressway for approximately 750 feet. In support of the 3D scan additional location surveying was performed
<br />to verify/reset right of way, horizontal/vertical control based on the FDOT Right of Way Map for SR 5. GPS location
<br />surveying was also required to locate any above ground appearances obscured or not visible to the scanner. Role:
<br />Senior Project Surveyor/CADD Manager.
<br />b.
<br />(1)TITLE AND LOCATION (City and State)
<br />Downtown Doral
<br />Doral, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION (If Applicable)
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm
<br />Surveying service included but not limited to boundary analysis, verify existing conditions, site coordination sheet,
<br />settlement & monitoring, construction as-builts, construction layout, and elevation certificate. Professional agreement
<br />current total is $276,019.94, a total of 400,000 sq. ft. Role: Project Surveyor/CADD Manager.
<br />c.
<br />(1)TITLE AND LOCATION (City and State)
<br />West Avenue and Environs
<br />Miami Beach, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2017
<br />CONSTRUCTION (If Applicable)
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm
<br />The project is a topographic survey for West Avenue and Environs. The project area is bounded by 17th Street on
<br />the north, 8th Street on the south, Alton Road on the east and Biscayne Bay on the west. It includes approximately
<br />22,400 linear feet of roadway and an additional 1,200 linear feet of storm sewer outfall. Total cost of $191,545.18.
<br />Role: Project Surveyor/CADD Manager.
<br />d.
<br />(1)TITLE AND LOCATION (City and State)
<br />1000 Museum
<br />Miami, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018
<br />CONSTRUCTION (If Applicable)
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm
<br />Surveying service included but not limited to boundary analysis, verify existing conditions, site coordination sheet,
<br />water and sewer easement, location of underground structures, settlement & monitoring, form board survey,
<br />construction as-builts, construction layout, 3-D scan, and elevation certificate. Professional agreement current total
<br />is $335,585.00, a total of sixty stories. Role: Project Surveyor/CADD Manager.
<br />e.
<br />(1)TITLE AND LOCATION (City and State)
<br />Aston Martin Residences
<br />Miami-Dade County, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2017
<br />CONSTRUCTION (If Applicable)
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm
<br />Surveying service included but not limited to boundary analysis, verify existing conditions, site coordination sheet,
<br />settlement & monitoring, form board survey, construction as-builts, construction layout, and elevation certificate.
<br />Professional agreement is on time & material, a total of 66 stories. Role: Project Surveyor/CADD Manager.
<br />Section E, Page 30
|