My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Maser Consulting, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Maser Consulting, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:05:37 AM
Creation date
8/21/2020 10:04:20 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY NUMBER <br />1 <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />West Avenue and Environs, City of Miami Beach Professional <br />Architectural and Engineering Services in Specialized <br />Categories on an “As-Needed Basis”, Miami Beach, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />8/2017 N/A <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER b. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER <br />City of Miami Beach Brian T. Bellino, PSM, City <br />Surveyor <br />305.673.7000 ext. 6132 / <br />brianbellino@miamibeachfl.gov <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />Maser Consulting performed Topographic Survey Services for West Avenue and Environs. The project area <br />bounded by 17th Street on the north, 8th Street on the south; Alton Road on the east and by Biscayne Bay on <br />the west includes approximately 22,400 linear feet of roadway and an additional 1,200 linear feet of storm <br />sewer outfall. The project includes compilation of topographic information in support of studies and/or design. <br />Scope includes: <br />•Establishing a baseline with 100-foot stations, monuments as required by Rule 5J-17.051 and 5J-17.052, <br />Florida Administrative Code and Chapter 472.027 of Florida Statutes set along the baseline at all changes <br />in alignment, points of curvature, block corners and at all street intersections; tying the baseline of the <br />survey to the right-of-way and sectionalized land monuments; and obtaining right-of-way information from <br />available records <br />•Cross-section elevations to define all grade breaks such as intersections, swale, edge of pavement, <br />pavement centerline, curb and gutter, edges of sidewalk, driveway connections, right-of-way line, edge <br />of the 25-foot-right of-way offset, encroachments (both natural and built-in), etc. <br />•Locate and identify all visible surface improvements and topographic features that exist along the width <br />of the corridor, such as the following: Existing valve boxes, water/electrical meter boxes, electrical pull <br />boxes, telephone/cable risers, fences, hydrants, etc.Section E, Page 31
The URL can be used to link to this page
Your browser does not support the video tag.