|
John A. Liptak, PSM, cont’d. Resume
<br />Maser Consulting P.A.
<br />SR 836 EIS Transit Study (30 miles), FDOT District 6
<br />Miami-Dade County, FL
<br />Photogrammetric Control Survey with more than 300 aerial target locations (horizontal & Vertical) including
<br />establishing Baseline of SR 836 from Downtown Miami to SR 821/Florida Turnpike and 1-mile Baseline North and
<br />South on SR 821.
<br />Monumentation
<br />Senior Surveyor & Mapper responsible for all field and office tasks, Survey sections and ¼ sections, monumentation
<br />& occupation including side streets; establish historic Baseline of Survey and determine Right of Way. After
<br />thorough review with FDOT staff; monument Right of Way and record Maps in Public Records.
<br />•SR 5/US 1 (10 miles), FDOT District 6, Miami-Dade County, FL
<br />•SR 25/Okeechobee Road (3 miles), FDOT District 6, Miami-Dade County, FL
<br />•SR 826/Palmetto Expressway (5 miles), FDOT District 6, Miami-Dade County, FL
<br />•SR 5/Biscayne Blvd/US 1 from NE 35th St to NE 206th St, Post Construction 7 projects (11+ miles),
<br />FDOT District 6, Miami-Dade County, FL
<br />•41 projects (TWO’s) of similar nature under contract C8W42
<br />Right of Way Control and Right of Way Mapping
<br />SR 836 / Perimeter Road (2.5 miles), FDOT District 6
<br />Miami-Dade County, FL
<br />Reestablish the Southerly Boundary of the Miami International Airport Property same being Northerly Boundary of
<br />SR 836 from SR 826 (Palmetto Expressway) to ½ mile east of NW 57th Avenue for FDOT improvements to SR 836
<br />and Perimeter Road.
<br />SR 997 Krome Avenue from SW 296 St to SW 88 St (13 miles), FDOT District 6
<br />Miami-Dade County, FL
<br />Multiple projects. Survey sections & ¼ sections, monumentation & occupation including side streets; establish
<br />historic Baseline of Survey; prepare Right of Way Control Survey and Map and determine Right of Way. Title search
<br />review and identification of over 100 Parcels for acquisition during design phase and preparation of final Right of
<br />Right of Way Maps.
<br />Design Surveys
<br />Set Primary Network Control (PNC) establish horizontal and vertical positions with Static GPS and traverse for
<br />quality geodetic & geometric positions. Three wire differential leveling for benchmarks, Topographic locations
<br />utilizing EFB and CAiCE; prepare 2d file of Topography and 3d digital terrain model (DTM) surface with break lines;
<br />check cross sections at 500 foot intervals to verify DTM reliability and establish historic Baseline & Centerline of
<br />Right of Way; all files delivered with a Surveyors Report.
<br />•West Avenue, City of Miami Beach (4 miles), Miami-Dade County, FL – Including utilizing Terrestrial
<br />Mobile LIDAR
<br />•SR A1A from Haulover Park to North of Broward County Line 2 Projects (2 miles each - 4 miles +),
<br />FDOT District 6, Miami-Dade County, FL
<br />•SR 5/US-1 from SW 103 Street to SW 144 Street (2 miles), FDOT District 6, Miami-Dade County, FL
<br />•Miami Dade County – 115 Topographic / Design Surveys (600’ to 2 miles long)
<br />•SR 976 Bird Road (3 miles), FDOT District 6, Miami-Dade County, FL – Including utilizing Terrestrial
<br />Mobile LIDAR
<br />Bridge Surveys
<br />Establish Horizontal and Vertical Control, Layout Verification, as-builts, underground utility locations, Field and
<br />Office Q/A, Q/C.
<br />•SR 860 Hallandale Bch Blvd Dual Bascule Bridge Replacement, FDOT District 4, Broward County, FL
<br />•Flagler Bascule Bridge Replacement, FDOT District 4, Palm Beach County, FL
<br />•PGA Boulevard Intra-Coastal Waterway, FDOT District 4, Palm Beach County, FL
<br />Section F, Page 5
|