<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Amanda Guillory, PE, ENV SP Project Engineer & Designer; Hydraulic
<br />Modeler; GIS
<br />A. TOTAL B. WITH CURRENT FIRM
<br />6 2
<br />15. FIRM NAME AND LOCATION (City and State)
<br />CES Consultants, Inc. Pembroke Pines & Tampa, FL
<br />16. EDUCATION (Degree and Specialization)17. CURRENT PROFESSIONAL REGISTRATION (State & Discipline)
<br />BS Environmental Engineering, University of Florida, 2014 Florida Professional Engineer #88628
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Envision Sustainability Professional; OSHA HAZWOPER 40-Hour Certified; Software: ArcGIS and ArcGIS Pro, AutoCAD Civil
<br />3D, HSPF Rainfall Modeling, CAPE and FFS Hydrologic Modeling, MIKE URBAN Hydraulic Modeling, ICPR V3 & V4 Modeling,
<br />BMPTRAINS Pollution Modeling, WinSLAMM Stormwater Pollutant Modeling, XPSWMM
<br />19. RELEVANT PROJECTS
<br />A.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />West Ave. North & South Neighborhood Utility & Resiliency
<br />Improvements Design-Build Projects, Miami Beach, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Ongoing Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Project Engineer, Modeling & Design In response to sea level rise and resiliency planning, the scope of work for this project
<br />includes complete replacement and rehabilitation of all public underground water, sanitary sewer, and storm sewer utilities,
<br />within the project’s limits. The project includes 16,000 LF of water main, 7,050 LF of sanitary gravity sewer, 12,800 LF of
<br />storm sewer and a 120,000 GPM stormwater pump station and outfall. In addition, the complete street redesign includes
<br />raising the existing grade of the roadway by 30”, a revised typical section to incorporate a pedestrian/bicyclist friendly
<br />corridor, public/private property harmonization, new traffic signals, street lighting, and landscaping. Responsibilities
<br />include being an integral member of stormwater modeling efforts, utilizing ICPR 4 and ArcGIS. Directly involved with both
<br />proposed stormwater conveyance design and sanitary sewer conveyance design, utilizing AutoCAD Civil 3D. Additional
<br />responsibilities include permitting, utility coordination efforts which involve attending and facilitating meetings, gathering
<br />and organizing utility data, and developing utility master plan drawings. Assisted with scope and budget developments for
<br />various project design elements. Cost: $72M
<br />B.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />MDWASD Local Wastewater Pump Station Projects – PS 0659 Upgrades,
<br />Miami, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2020
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Project Engineer for this project to design the rehabilitation of the existing wet pit/dry pit pump station to become a
<br />submersible station. Scope of services include survey and utility coordination, pump selection, design of rehabilitated
<br />pump station, design of connecting force mains, preparation of Final Engineering Report, development of contract and
<br />bid documents, opinion of probable construction costs (OPCC), permitting, and engineering services during construction.
<br />C.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />David L. Tippin Water Treatment Facility High Service Pump Station &
<br />Misc. Improvements, Tampa, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Ongoing Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Project Engineer for QA/QC review of design, design drawings, specifications, permitting, and reports, for construction of
<br />replacement of high service pump station and transmission pipe at the WTF.
<br />D.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />Private Property I/I Program – Wauwatosa I/I Reduction Evaluation,
<br />Milwaukee, WI
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2017
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Engineer, H&H Modeling As part of the MMSD PP I/I Program, performed an I/I reduction evaluation to evaluate
<br />the effectiveness of rehabilitation work performed in the Wauwatosa community. Responsibilities included using H&H
<br />modeling programs to develop and calibrate I/I flow models for the site monitoring locations and reviewing and analyzing
<br />pre- and post-rehab monitoring data and performing a flow frequency analysis. This project also involved the comparisons
<br />of results based on locations of rehabilitation types which included CIPP Liners, short lateral grouting, and long lateral
<br />grouting. Summarized findings along with relevant comparison tables, graphs, and ArcGIS figures within a final report.
|