<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />Private Property Inflow and Infiltration Reduction Program,
<br />Milwaukee, WI
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2017
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Engineer Heavy rains in June 2010 produced widespread sewer backups into homes and businesses in the MMSD
<br />service area of 28 communities. MMSD took the initiative to launch a regional program to investigate and correct private
<br />property sewer problems that contribute excess flows in wet weather to the municipal sewer systems. The project included
<br />a range of services from investigating sources of private property infiltration and inflow (I/I), determining fixes, assisting
<br />municipalities with developing local policies to managing their individual programs, and performing flow reduction analyses
<br />that determine project benefits. The contract included services provided directly to MMSD that have regional benefits
<br />as well as to municipalities who request assistance with developing and implementing their programs. Responsibilities
<br />included gathering and analyzing funding data, meter maintenance data, homeowner review and public outreach data, case
<br />studies, along with developing and writing an effectiveness evaluation on eight (8) projects for the final report.
<br />F.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />Private Property I/I Program – Basement Backup Risk Analysis,
<br />Milwaukee, WI
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2017
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Engineer, H&H Modeling As part of the MMSD PP I/I Program, the purpose of this project was to evaluate the
<br />existing basement backup information for all MMSD communities and provide recommendations and summarize findings in
<br />a final report. Responsibilities included the collection and analysis of basement backup flow data for the 28 communities
<br />within MMSD and provide a relevant overview of the statistical information relevant to the different review methods
<br />utilized (Conceptual vs. Capacity-Flow Method), and subsequently performed life cycle cost analyses on the results. This
<br />development involved extensive use of the FFS model, Excel, and ArcGIS. Additionally, developed various tables, graphs,
<br />and ArcGIS figures to indicate findings along with statistically relevant trends and recommendations. Attended client
<br />meetings and assisted with writing reports.
<br />G.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />Brookfield Post-Rehabilitation Analysis, Brookfield, WI PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2017
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Project Engineer, H&H Modeling Prior to this project, a Sewer System Assessment Study was developed, that was required
<br />by an Administrative Consent Order (ACO) by USEPA Region 5. The study recommended solutions to reduce Sanitary Sewer
<br />Overflows to a once in 10-year frequency and included capacity improvements and I/I reduction on private property. The
<br />City implemented the recommendations and requested flow monitoring/modeling in the post-rehab state to estimate the
<br />amount of I/I reduction that was achieved in six previously monitored/modeled areas. Responsibilities included gathering
<br />and analyzing pre- and post-rehab flow, rainfall, and maintenance data for the area. Utilized the HSPF Rainfall and CAPE
<br />modeling programs to develop and calibrate I/I flow models for the monitoring locations. Summarized findings along with
<br />comparison tables, graphs, and ArcGIS figures within final report.
<br />H.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />OC TA Force Main Project 2, Orange County, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2016
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Project Engineer Continuing services contract to establish a R/R program strategy for wastewater collection, water
<br />distribution and reclaimed water infrastructure. Scope included evaluating the entire system and assisting the County to
<br />develop a strategy to make key decisions about which assets to rehab/replace and when, and apply available funding to
<br />meet system needs. Services included conditions, strategic planning and utility performance consulting, assessments,
<br />evaluation, recommendations for improved processes and procedures, data management and tracking, R&R prioritization,
<br />and preliminary design. Responsibilities included collecting and organizing county wide pipe networking data, created and
<br />utilized ArcGIS maps and created comparison tables regarding pipe materials, sizing, locations, among others. Developed
<br />report which pointed out the different areas throughout the County where pipe infrastructure had the lowest and highest
<br />potential risks for degradation of the pipes integrity and provide strategies for R/R. Showed these locations through ArcGIS
<br />maps, images, and tables throughout the report.