Laserfiche WebLink
E-27Proven solutionsResponsive and dependable performance <br />City of Sunny Isles Beach RFQ No. 20-07-01: Continuing Professional Consulting Services (CCNA) <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Simon Sainsbury, PhD Cand.., PE Electrical Engineering, I&C & SCADA A. TOTAL B. WITH CURRENT FIRM <br />36 3 <br />15. FIRM NAME AND LOCATION (City and State) <br />CES Consultants, Inc. West Palm Beach, FL <br />16. EDUCATION (Degree and Specialization)17. CURRENT PROFESSIONAL REGISTRATION (State & Discipline) <br />Post Graduate Studies, CFD, Mechanical Engineering Program, Florida <br />Institute of Technology, 2011; MS Ocean Engineering, Florida Institute of <br />Technology, 1986; BS Electrical Engineering, Florida Institute of Technology, <br />1983 <br />FL Professional Engineer #41185 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />19. RELEVANT PROJECTS <br />A. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />SFWMD Pump Station Tower Grounding Modifications, <br />Palm Beach County, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2017 2019-2020 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Senior Electrical Engineer of Record responsible for design of microwave tower grounding systems to protect personnel <br />and equipment in accordance with current TIA/ANSI/EIA grounding standards at Pump Stations G-310, G-335, G-370 and <br />G-372. <br />B. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Lincoln Road Stormwater Pump Station, Miami Beach, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Ongoing Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Senior Electrical Engineer of Record responsible for design of Lincoln Road Stormwater Pump Station with three 20,000 <br />GPM pumps, VFDs, Control Panel, RTU/Telemetry and associated electrical equipment. <br />C. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />MDWASD Pump Station Improvement Program (PSIP), <br />Miami-Dade County, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2019 2020 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Senior Electrical Engineer of Record for retrofit design of PS 0673 with two 1500 GPM pumps, Control Panel, RTU/Telemetry, <br />Backup Generator and associated electrical equipment. <br />D. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />SFWMD Everglades Restoration & Capital Project, West Palm Beach, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2010 Various <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Senior Electrical Engineer of Record providing general support to all projects and design services on plan and specification <br />development for SFWMD. Responsibilities included: assisting with coordination of project deliverables and the technical <br />review process, performing engineering calculations and design documents for project plans and specification development, <br />and coordination with consultant design team. Projects included: $6M Pump Station Re-Powering and Automation – <br />Engine Control Panels, Generator, Lighting, Grounding and Lightning, Protection, RTU Automation and Telemetry, Electrical <br />Service; $2M Pump Station Overhead Picker Trash Rake Replacement; $1M Pump Station Traveling Trash Rake and Conveyor <br />Replacement; $800K Catwalk and Culvert Gate Support Replacement; $600K Pump Station Spillway Gate Cable Drum <br />Operator Replacement; $500K Spillway Gate Cathotic Protection and Structure Repairs; $400K Pump Station Microwave <br />Communication Tower Ground and Lighting Protection; and $200K Pump Station Sluice Gate Automation.