Laserfiche WebLink
E-28Proven solutionsResponsive and dependable performance <br />City of Sunny Isles Beach RFQ No. 20-07-01: Continuing Professional Consulting Services (CCNA) <br />E. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Washington Road Utilities & Stormwater Outfall Improvement, <br />West Palm Beach, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Senior Electrical Engineer of Record responsible for design of the Washington Road Stormwater Pump Station with two <br />7,000 GPM pumps, Control Panel, RTU/Telemetry and associated electrical equipment. The project also includes new water <br />mains and sewer collection system. <br />F. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Phase II Design Criteria Package Requirements, Miami Beach, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2019 2020 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Senior Electrical Engineer RFP 2018-233KB Design, Build, Operate, and Maintain Water, Wastewater and Stormwater SCADA <br />and PLC: Coordinate with Electrical and I&C department engineers to develop drawings, specifications, communication <br />options survey/reports for design criteria package including bid questions and responses and ongoing technical assistance. <br />G. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Wastewater Resiliency Program, DEP Owl’s Head, New York, NY PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2018 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Senior Electrical Engineer of Record responsible for the electrical design and implementation of flood adaptation strategies <br />to harden the Owl’s Head Wastewater Treatment Plant against further flood events. NEMA 6P control panel upgrades, load <br />and voltage drop calculations, one-line diagrams, construction and design cost estimates, project specifications. <br />H. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />MDWASD Pump Station Improvement Program PS 0639, <br />Miami-Dade County, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2020 Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Senior Electrical Engineer of Record for retrofit design of Wastewater PS 0639 with two 1200 GPM pumps, Control Panel, <br />RTU/Telemetry, Backup Generator and associated electrical equipment. <br />I. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />MDWASD Pump Station Improvement Program PS 0659, <br />Miami-Dade County, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2020 Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Senior Electrical Engineer of Record for retrofit design of Wastewater PS 0659 with two 1000 GPM pumps, Control Panel, <br />RTU/Telemetry, Backup Generator and associated electrical equipment. <br />J. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />MDWASD Pump Station Improvement Program PS 0132, <br />Miami-Dade County, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2020 Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Senior Electrical Engineer of Record for retrofit design of Wastewater PS 0132 with two 1500 GPM pumps, Control Panel, <br />RTU/Telemetry, and associated electrical equipment. <br />K. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />West Avenue Storm Water Drainage Wells, Miami Beach, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2019 Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Senior Electrical Engineer of Record for design of 11 stormwater drainage well systems, 60 HP pump stations, submersible <br />control panels, and associated electrical equipment. <br />L. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />West Avenue PS Backup Generators, Miami Beach, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2019 Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Senior Electrical Engineer of Record for retrofit design of seven (7) Pump Stations with 250KW Backup Generators and <br />associated electrical equipment. <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2