|
E-28Proven solutionsResponsive and dependable performance
<br />City of Sunny Isles Beach RFQ No. 20-07-01: Continuing Professional Consulting Services (CCNA)
<br />E.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />Washington Road Utilities & Stormwater Outfall Improvement,
<br />West Palm Beach, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2019
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Senior Electrical Engineer of Record responsible for design of the Washington Road Stormwater Pump Station with two
<br />7,000 GPM pumps, Control Panel, RTU/Telemetry and associated electrical equipment. The project also includes new water
<br />mains and sewer collection system.
<br />F.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />Phase II Design Criteria Package Requirements, Miami Beach, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2019 2020
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Senior Electrical Engineer RFP 2018-233KB Design, Build, Operate, and Maintain Water, Wastewater and Stormwater SCADA
<br />and PLC: Coordinate with Electrical and I&C department engineers to develop drawings, specifications, communication
<br />options survey/reports for design criteria package including bid questions and responses and ongoing technical assistance.
<br />G.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />Wastewater Resiliency Program, DEP Owl’s Head, New York, NY PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2018
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Senior Electrical Engineer of Record responsible for the electrical design and implementation of flood adaptation strategies
<br />to harden the Owl’s Head Wastewater Treatment Plant against further flood events. NEMA 6P control panel upgrades, load
<br />and voltage drop calculations, one-line diagrams, construction and design cost estimates, project specifications.
<br />H.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />MDWASD Pump Station Improvement Program PS 0639,
<br />Miami-Dade County, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2020 Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Senior Electrical Engineer of Record for retrofit design of Wastewater PS 0639 with two 1200 GPM pumps, Control Panel,
<br />RTU/Telemetry, Backup Generator and associated electrical equipment.
<br />I.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />MDWASD Pump Station Improvement Program PS 0659,
<br />Miami-Dade County, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2020 Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Senior Electrical Engineer of Record for retrofit design of Wastewater PS 0659 with two 1000 GPM pumps, Control Panel,
<br />RTU/Telemetry, Backup Generator and associated electrical equipment.
<br />J.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />MDWASD Pump Station Improvement Program PS 0132,
<br />Miami-Dade County, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2020 Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Senior Electrical Engineer of Record for retrofit design of Wastewater PS 0132 with two 1500 GPM pumps, Control Panel,
<br />RTU/Telemetry, and associated electrical equipment.
<br />K.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />West Avenue Storm Water Drainage Wells, Miami Beach, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2019 Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Senior Electrical Engineer of Record for design of 11 stormwater drainage well systems, 60 HP pump stations, submersible
<br />control panels, and associated electrical equipment.
<br />L.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />West Avenue PS Backup Generators, Miami Beach, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2019 Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Senior Electrical Engineer of Record for retrofit design of seven (7) Pump Stations with 250KW Backup Generators and
<br />associated electrical equipment.
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
|