E-30Proven solutionsResponsive and dependable performance
<br />City of Sunny Isles Beach RFQ No. 20-07-01: Continuing Professional Consulting Services (CCNA)
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Erik M. Alcantara, EI, ENV SP Project Engineer & Designer A. TOTAL B. WITH CURRENT FIRM
<br />6 4
<br />15. FIRM NAME AND LOCATION (City and State)
<br />CES Consultants, Inc. Pembroke Pines, FL
<br />16. EDUCATION (Degree and Specialization)17. CURRENT PROFESSIONAL REGISTRATION (State & Discipline)
<br />M.Eng Civil Engineering, University of Florida, Ongoing
<br />BS, Civil Engineering, Instituto Tecnológico de Santo Domingo (INTEC), 2014
<br />FL Engineer Intern #1100019309, Dominican
<br />Republic Professional Engineer #36854
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Envision Sustainability Professional; Manhole Assessment Certification Program (MACP); Pipeline Assessment Certification
<br />Program (PACP); FDOT Intermediate Work Zone Traffic Control #15002; FDEP Qualified Stormwater Management Inspector
<br />#36172; FDOT CTQP QC Manager; FDOT CTQP Asphalt Paving Technician Level 1; AutoCAD Civil 3D Autodesk License
<br />#17428036F5; Member, American Society of Civil Engineers; Younger Member Group President for ASCE Miami-Dade Branch
<br />19. RELEVANT PROJECTS
<br />A.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />West Ave. North & South Neighborhood Utility & Resiliency
<br />Improvements Design-Build Projects, Miami Beach, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Ongoing Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Project Engineer for the $72M Design-Build projects to develop a stormwater model, water/sewer/utility and roadway
<br />design, permitting and infrastructure construction of 1.2 miles of roadway to address sea level rise in the West Avenue
<br />Basin. This resiliency project will provide the community protection from flooding during storm events and high seasonal
<br />tides. The project requires raising the roadway approximately 30 inches while providing a 10-year level of service with no
<br />structure flooding. The contributing basin is 600 acres and all 12 utilities along the roadway will be affected. Modeling using
<br />AdICPR4 and upsizing and design of all curb inlets and yard inlets followed by significant upsizing and modifications of two
<br />pumps stations is required. The project includes 16,000 LF of water main, 7,050 LF of sanitary gravity sewer, 12,800 LF of
<br />storm sewer, a 120,000 GPM stormwater pump station and outfall, and water meter service conversions from the rear of
<br />private properties to new water lines and connections in the right-of-way.
<br />B.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />MDWASD Pump Station Improvement Program (PSIP) & Associated
<br />Force Mains, Miami-Dade County, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Ongoing Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />As Project Engineer, provided evaluation, cost, engineering analysis, design, coordination, permitting and management for
<br />the rehabilitation and replacement of multiple pump stations for the PSIP. The project consisted of existing pump station
<br />inspection, coordination of survey and geotechnical services, design of pump station rehabilitation or replacement, design
<br />of connecting force mains, permitting, and limited construction services. The pump station projects include PS 0449, PS
<br />0609, PS 0147, PS 0331, PS 0440, and PS 0081.
<br />C.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />NW 12th Avenue Force Main Replacement, North Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2019
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Project Engineer for the design, permitting, and construction of 10,500 LF of 10- and 12-inch replacement force main in
<br />NW 12th Avenue extending from NW 95th Street to NW 125th Street. The project replaced aging, asbestos-cement and cast
<br />iron force mains with corrosion resistant PVC pipe. A number of private force main connections required relocation and
<br />reconnection to the new force main, as well as planning for uninterrupted service during construction.
<br />D.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />Miramar Infrastructure Improvements & Service Conversions, Phase III,
<br />Miramar, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2019 2019
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Project Engineer providing construction management and inspection services for the upgrade of approximately 72,000 LF
<br />of water main. The project consisted of upgrading existing 2-inch and 4-inch residential water mains to 6-inch, 8-inch and
<br />12-inch water mains, as well as the installation of fire hydrants, throughout the historic neighborhood.
|