E-31Proven solutionsResponsive and dependable performance
<br />City of Sunny Isles Beach RFQ No. 20-07-01: Continuing Professional Consulting Services (CCNA)
<br />E.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />MDWASD Ocean Outfall Legislation Program, Miami-Dade County, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2017 2017
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Project Engineer for development of a Conceptual Design Report for the projects in the North District transmission and
<br />pumping system necessary to meet the requirements of the Ocean Outfall Legislation (OOL) Compliance Plan. This CDR
<br />included approximately 21,000 LF of 48-inch diameter force main and approximately 1,500 LF of 36-inch diameter force
<br />main. Tasks completed include Data Review and Pipeline Project Analysis. Size: 22,500 LF of Sanitary Sewer Force Mains
<br />Cost: $250k
<br />F.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />D/B Replacement of Water Main & Service Conversions in “Donut Hole”
<br />Area, Miami Gardens, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2019 Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Project Engineer for the replacement of the undersized and deteriorated water mains and existing main loop closures. The
<br />project includes the following main elements: ±22,450 LF of 8-inch ductile iron water main and pipe fittings: ±12,060 LF of
<br />12-inch ductile iron water main pipe and fittings; ±1,050 LF of 6-inch ductile iron water main pipe and fittings; and ±560
<br />water service conversions from rear of property to front of property, requiring right-of-way and private property permitting.
<br />G.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />MDWASD Engineering, Design and Related Services for the Local Pump
<br />Station Improvement Program, Miami-Dade County, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Ongoing Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Project Engineer providing inspection/evaluation, analysis and design of multiple sanitary sewer lift stations ranging from
<br />20 HP to 60 HP and associated force mains. Meeting the FEMA Base Flood Elevation for some of these small locations while
<br />maintaining operations and maintenance protocols is a challenge. Under this contract, converted several wet well/dry well
<br />systems into submersible stations, requiring significant structural design in order to reuse the existing facilities. This effort
<br />is more cost effective than installing a new wet well. Additionally, our team looks carefully at constructability in developing
<br />creative solutions that meet all of the client’s needs while maximizing construction dollars. Below are some of the pump
<br />stations awarded as task orders to CES under this contract: Design of Pump Stations No. 673, No. 063, No. 659 No. 639 &
<br />Generator Replacement PS318, PS464 & PS475.
<br />H.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />Water & Sanitary Sewer System Improvements for Utility Analysis
<br />Zones (UAZ) 113B, Lauderdale Lakes, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2018 2019
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Project Engineer As part of the Broward County Water and Wastewater Services (BCWWS) UAZ 111 project, provided utility
<br />easement procurement services. Under the existing system configuration, BCWWS was unable to access existing sanitary
<br />sewer infrastructure for maintenance and/or repair purposes. Five Letters of No Objection were signed by property owners
<br />to obtain 25’ utility easement grants and facilitate installation/maintenance of required sanitary sewer improvements. The
<br />effort included coordination with property owners and associations, as well as Esri ArcGIS mapping and utility easement
<br />figure development.
<br />I.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />BCWWS Master Pump Station 450 Improvements, Lauderdale Lakes, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2019 2019
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Project Engineer for the construction management services associated with Pump Station 450 Improvements, specifically
<br />to provide field observation services and specialty inspections on behalf of the Broward County Building Department. This
<br />project includes the installation of line stops, tapping valve/sleeves, temporary bypass pumping system, primary pumps
<br />system, jockey pumps system, seal water system, hoisting systems, electrical room motor control center, variable frequency
<br />drives, control system, air conditioning and ventilation system, store front door, roll-up door, demolition, and telemetry
<br />system. The work includes all associated, site, building, structural, pumping mechanical, building mechanical, electrical and
<br />control systems complete, tested, and ready for operation.
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
|