|
E-33Proven solutionsResponsive and dependable performance
<br />City of Sunny Isles Beach RFQ No. 20-07-01: Continuing Professional Consulting Services (CCNA)
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Bishow N. Shaha, EI Project Engineer & Designer A. TOTAL B. WITH CURRENT FIRM
<br />4 1
<br />15. FIRM NAME AND LOCATION (City and State)
<br />CES Consultants, Inc. West Palm Beach, FL
<br />16. EDUCATION (Degree and Specialization)17. CURRENT PROFESSIONAL REGISTRATION (State & Discipline)
<br />PhD Candidate, Sustainable Infrastructure, Florida Atlantic University, 2019
<br />MS Civil Engineering (Environmental), Florida Atlantic University, 2016
<br />BSc Civil Engineering (Environmental), Bangladesh University of Engineering
<br />and Technology, Dhaka, Bangladesh, 2013
<br />FL Engineer Intern
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Member, American Association of Civil Engineers; Member, Florida Water Environment Association; Member, Solid Waste
<br />Association of North America; Member, Water Environment Federation; 4ocean Volunteer; Florida Water and Environment
<br />Association FAU Student Chapter Vice President; FAU Bangladeshi Student Association President; Skills: Microsoft Office,
<br />LandGEM-EPA, PHREEQC-USGS, Geochemist’s Workbench, GPS-X, HEC-RAS, EPANET, ArcGIS, MATLAB, and AutoCAD
<br />19. RELEVANT PROJECTS
<br />A.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />Washington Road Utilities & Stormwater Outfall Improvement,
<br />West Palm Beach, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Ongoing Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Project Engineer for design of new stormwater conveyance, replacement watermain, and replacement sanitary sewer mains
<br />and manholes. The stormwater conveyance and management system will include curb and gutter, piping up to 60” RCP,
<br />sediment and floatable baffle box, a 30cfs pump station to handle King Tide flooding, and gravity outfall to the Intracoastal
<br />Waterway. The project also entails the redesign of the road cross section to include new sidewalks, driveways and bike lanes
<br />along with raised intersections and roundabouts for traffic calming, all while preserving the trees along the project corridor.
<br />CES is also providing neighborhood outreach to this very high-profile part of the City. The project also includes new water
<br />mains and sewer collection system. Cost: $6M
<br />B.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PBCWUD Water Distribution Systems Replacements,
<br />Palm Beach County, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Project Engineer for the installation of approximately 8,000 LF of 6-12-inch diameter PVC, HDPE, and DIP water main to
<br />facilitate looping of the distribution system. The looping will eliminate the dead-end configuration, improving water quality
<br />services. The work will include the replacement and relocation of approximately 10,000 LF of 6-20-inch PVC, HDPE, and DIP
<br />watermain for better accessibility and protection from accidental breakage.
<br />C.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />Palm Beach County Integrated Utility Master Plan Utility,
<br />Palm Beach County, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Project Engineer for engineering services in support of prime consultant for the development of the Palm Beach County Water
<br />Utilities Department Integrated Master Plan. The scope of the services includes water and wastewater system evaluation and
<br />analysis of both the East and West systems. The project includes summarizing PBCWUD asset inventory, identifying areas
<br />of probable extension of services based on the service area analysis, summarizing major on-going and proposed capital
<br />projects, performing a geospatial analysis of fire hydrants in the system, and identifying areas where hydrant spacing does
<br />not meet PBCWUD standards, reviewing on-going O&M, capital programs and policies for the transmission system and
<br />evaluating them against standard industry practice. In addition, CES is responsible for summarizing the ongoing condition
<br />assessment, rehabilitation and inflow/infiltration programs in the collection system.
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
|