Laserfiche WebLink
E-34Proven solutionsResponsive and dependable performance <br />City of Sunny Isles Beach RFQ No. 20-07-01: Continuing Professional Consulting Services (CCNA) <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Ashraf Iqbal, EI Project Engineer, Designer, CA & CEI <br />Inspector <br />A. TOTAL B. WITH CURRENT FIRM <br />15 12 <br />15. FIRM NAME AND LOCATION (City and State) <br />CES Consultants, Inc. West Palm Beach, FL <br />16. EDUCATION (Degree and Specialization)17. CURRENT PROFESSIONAL REGISTRATION (State & Discipline) <br />MS Civil Engineering & Environmental Testing, Florida International <br />University; BS Civil Engineering, Osmania University <br />FL Engineer Intern <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Mr. Ashraf Iqbal is a civil and structural engineer with comprehensive experience in project implementation and monitoring <br />involving liaising with other disciplines. Ashraf has extensive experience in the design of structural elements and is well-versed <br />in executing construction of projects involving construction development quality control and safety standards in compliance <br />to project specifications and codes. He has worked on numerous projects for various municipalities and county agencies, <br />the South Florida Water Management District and for the US Army Corps of Engineers. Certifications: ACI Concrete Field <br />Testing Technician Level I; Hazardous Waste Site Assessment; Industrial Wastewater Treatment; Air Pollution Control; Design <br />of Highway Bridges. Member, American Society of Civil Engineers <br />19. RELEVANT PROJECTS <br />A. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />SFWMD Culvert Replacement Program, Various Locations, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2019 2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Construction Inspector responsible for overseeing construction activities for the Culvert Replacement Program in West Palm <br />Beach, to include supervising and inspecting contractor’s work to assure compliance with specifications, establishing onsite <br />solutions to unforeseen issues found in the field, reviewing RFIs, contractor shop drawings, contractor’s pay applications <br />and change orders, and conducting progress meetings with the SFWMD and the contractor. <br />B. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />RFB Field Station Culvert Replacement Project, West Palm Beach, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2019 2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Project Engineer responsible for supervising and inspecting the removal and replacement of culverts on canals L-8, L-12, <br />C-18 and L-15. The project scope included the removal and disposal of existing multiple 66” diameter corrugated metal <br />pipes (CMPs) with new 66” and 72” corrugated metal pipes with flashboard risers. Responsibilities included monitoring <br />of contractor’s daily construction activities including site excavation, dewatering, CMP installations, backfilling, riprap and <br />other restoration activities. <br />C. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Miramar Infrastructure Improvements & Service Conversions, Phase III, <br />Miramar, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2019 2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Construction Inspector providing construction management and inspection services for the upgrade of approximately <br />72,000 LF of water main. The project consisted of upgrading existing 2-inch and 4-inch residential water mains to 6-inch, <br />8-inch and 12-inch water mains, as well as the installation of fire hydrants, throughout the historic neighborhood. <br />D. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Water & Sanitary Sewer System Improvements for Utility Analysis <br />Zones (UAZ) 113B, Lauderdale Lakes, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2018 2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Senior Project Engineer for the design of water distribution system and sanitary sewer system design for Utility Analysis Zone <br />113B. Provided information for utility conflicts adjustments and prepared specifications for construction of improvements. <br />E. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />MDWASD PSIP Design of PS 0336, Miami Lakes, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2017 2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Design Engineer for engineering analysis and design, including inspecting, designing, and constructing a new pump station <br />to replace the existing pump station in accordance with WASD standards and the EPA Consent decree criteria.