My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Engenuity Group, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Engenuity Group, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:30:07 AM
Creation date
8/21/2020 10:28:54 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> STANDARD FORM 330 (1/2004) PAGE 3 <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br />8 <br />21. TITLE AND LOCATION (City and State) <br />RPB Branch Library Sanitary Sewer Rehabilitation <br />(Royal Palm Beach , Florida ) <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (If applicable) <br />2018 <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER <br />Palm Beach County Library <br />Department <br />b. POINT OF CONTACT NAME <br />Brian Allen, Robling <br />Architecture for Construction <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />(561) 649 -6705 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />Engenuity Group is working with Robling Architecture for Construction, Inc. to provide all <br />civil engineering design for the replacement of a compromised sewer l ine located <br />underneath the Royal Palm Beach Branch of the Palm Beach County Library System. <br />Engenuity Group has worked with Library Department Staff and the architect to design a <br />Sanitary Sewer Service Line plan to remove and replace the broken line that runs from <br />outside the libraries northern building to the sanitary main located within the Civic Center <br />Way right-of-way. Construction plans also include details and specifications necessary for <br />contractor. <br /> <br />Engenuity Group has also prepared a topographic survey of the area located outside of <br />the Library’s northern building on Civic Center Way where the existing line runs extending <br />to the building and through the parking area. Data collected includes inverts at <br />manholes and cleanouts and all other above ground improvements. Engenuity Group is <br />also the project manager for the contractor that will remove and install the new sewer <br />line and will oversee the production of record drawings after construction completion. <br /> <br /> <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME <br />Engenuity Group, Inc. <br />(2) FIRM LOCATION (City and State) <br />Deerfield Beach, Florida <br />(3) ROLE <br /> Civil Engineering & Land <br />Surveying <br /> <br />55
The URL can be used to link to this page
Your browser does not support the video tag.