Laserfiche WebLink
<br />WOLFGANG HUECK, PSM <br />FIELD CREW SUPERVISOR <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />PROJECT EXPERIENCE <br /> <br />Between NW 1 Avenue & NE 2 Ave. and NW 8 St. & NW 9 St. Lyric Subdivision, Miami, Florida. <br />Project Description: Project consists of initial Boundary Survey, Topographic Survey, Tentative Plat, and Final Plat preparat ion for City <br />of Miami & Miami-Dade County review and approval. Role in Project: Field Crew Supervisor. <br /> <br />S.F.W.M.D. (Big Cypress Basin) Naples, Florida. <br />Project Description: The project consists of As-Builts for 24 structure elevations in North American Vertical Datum of 1988. Establish <br />NAVD 88 Elevations, record survey’s field Work of 24 sites, Preliminary Surveyor’s Report of all sites and Final Surveyor’s Report, <br />QA/QC Completed. Role in Project: Field Crew Supervisor. <br /> <br />North Dade Sewage Treatment Plant, Miami-Dade Water and Sewer Department, Miami, Florida. <br />Project Description: Boundary and Topographic Survey in support of the treatment plant upgrades. This project included the use of <br />laser scanning in 3-D to locate the components of the plant including tanks, piping and other features. Role in Project: Field Crew <br />Supervisor. <br /> <br />Krome Avenue, Florida Department of Transportation, Miami, Florida. <br />Project Description: Right-of-Way maps of Krome Avenue in the 5-mile segment between SW 8th Street and Kendall Drive in support <br />of the reconstruction of Krome Avenue from 2 lane rural section roadway to a 4-lane divided urban section roadway. Role in Project: <br />Field Crew Supervisor. <br /> <br />State Road 7 (7th Avenue) Maintenance Maps, Florida Department of Transportation, Miami, Florida. <br />Project Description: Specialized surveying consisting of the preparation of Maintenance Maps for four intersections along the SR 7 <br />roadway corridor. Role in Project: Field Crew Supervisor. <br /> <br />Kendall Drive (SW 88 Street from SW 73rd Place to US 1), Miami-Dade County, Florida. <br />Project Description: DTM / PNC Survey. Processed field data, performed right-of-way analysis and prepared DTM and PNC analysis. <br />Role in Project: Field Crew Supervisor. <br /> <br /> <br /> <br /> <br />Wolfgang Hueck is a Professional Surveyor and Mapper with 34 <br />Years of experience. His responsibilities include supervision and <br />preparation of the wide variety of surveys encountered at <br />Biscayne Engineering (Boundary, ALTA/ACSM, Specific <br />Purpose, Topographic, Mean High Water, etc.). He works <br />closely with the office CADD operators and field crew personnel <br />in the management of the numerous construction surveying <br />projects performed throughout South Florida. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Education <br /> 1974-1981 University of Nicaragua, <br />U.N.A.N – Civil Engineering <br />Registration <br /> Professional Surveyor & Mapper License <br />No. LS 6519 <br /> <br />Affiliation <br /> Member Florida Surveying and Mapping <br />Society (FSMS) <br />Years of Experience <br /> 34 Years <br /> <br /> <br /> <br />66