Laserfiche WebLink
EXAMPLE PROJECT KEY NUMBER <br />..- . i.. 3 <br />Environmental Engineering <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />Former Sabal Golf Remediation PROFESSIONAL SERVICES CONSTRUCTION (Ifapplicable) <br />Pompano Beach, FL 2019 N/A <br />PROJECT•WNER'S INFORMATION <br />a. PROJECT OWNER 770— OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER <br />City of Pompano Beach Horacio Danovich (954) 786-7834 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (include scope, size, and cost) <br />The Former Sabal Golf Course is an 11 -acre remnant of the golf course that has not yet been redeveloped. In advance of <br />its redevelopment into a recreational use property (Sports Park), this remaining portion, the site, located at 3151 N.W. 31 st <br />Street in Pompano Beach, Florida, underwent a 9,600 -ton (non -hazardous) soil source removal project. <br />Source removal activities were conducted at multiple locations at the proposed Pompano Beach Sports Park (Former <br />Sabal Golf Course) to remove soil exhibiting arsenic concentrations exceeding the alternative recreational soil cleanup <br />target level (SCTL) and soil exhibiting dieldrin concentrations above the residential direct exposure SCTL. Source removal <br />activities also included stormwater pollution prevention planning (SWPPP/NPDES) and monitoring and health and safety <br />planning, including dust suppression and air monitoring. <br />Terracon managed all subcontractors, coordinated all field activities, documented daily activities, conducted air monitoring, <br />and coordinated logistics associated with the field project. The firm managed the field schedule, ensuring timely completion <br />of field work product on an expedited time frame, coordinated daily and weekly safety meetings, and prepared daily field <br />reports. The firm verified that project -specific QA/QC procedures were implemented through all aspects of the project. <br />Firm's Fee: $896,724 <br />4! <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) <br />a. lrerracon West Palm Beach, FL <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) <br />b. lrerracon Fort Lauderdale, FL <br />(3) ROLE <br />Prime Consultant <br />(3) ROLE <br />Prime Consultant <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />C. lrerracon Winter Park, FL Prime Consultant <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />d. <br />STANDARD FORM 330 (REV. 812016) 62 <br />