Laserfiche WebLink
Marine and site/civil improvements for the redevelopment of a new marina facility with approximately 400 feet of bulkhead. <br />Surveying, water and sanitary sewer design, utility coordination, and construction administration services provided. <br />Redesigned sheet pile bulkhead with augercastpile-supported reinforced concrete forklift launching platform. <br />f. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Island Gardens Mega Yacht Harbour, Miami, Florida Island Gardens Mega Yacht Harbour, Miami, Florida Island Gardens Mega Yacht Harbour, Miami, Florida Island Gardens Mega Yacht Harbour, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2015 2015 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Marina design and environmental permitting for 50-slip megayacht harbor on Watson Island as part of $600M site <br />redevelopment. Hydrographic and marine resource surveys and underwater bulkhead assessments provided. Design of <br />dredging, mitigation, fixed piers, and utilities for vessels up to 450 feet long. <br />g. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Jose Marti Park, MiamiJose Marti Park, MiamiJose Marti Park, MiamiJose Marti Park, Miami,,,, Florida Florida Florida Florida <br /> <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2008 2008 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Site/civil engineering for 1-acre project site development with a community gymnasium. Paving, grading and stormwater <br />management designs were completed and water/sewer services were provided to the site. Street improvements were <br />designed for South West 5th Street. <br />h. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Kennedy Park Shoreline Stabilization, Miami, Florida Kennedy Park Shoreline Stabilization, Miami, Florida Kennedy Park Shoreline Stabilization, Miami, Florida Kennedy Park Shoreline Stabilization, Miami, Florida <br /> <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2012 N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Design and environmental permitting for a shoreline stabilization and enhancement project. Conducted detailed mangrove <br />and upland vegetation and topographic surveys to determine areas in need of enhancement and placement of view <br />corridors. Improving shoreline at existing passive use park to include exotic removal, stabilizing shoreline with native <br />vegetation and properly permitted natural shoreline stabilization and creation of public view corridors through key locations <br />within densely vegetated mangrove fringe. <br />i. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Maurice A. Ferré Park, Miami, FloridaMaurice A. Ferré Park, Miami, FloridaMaurice A. Ferré Park, Miami, FloridaMaurice A. Ferré Park, Miami, Florida <br /> <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2018 2018 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Civil engineering design and permitting for 24-acre bayfront park. Design included a stormwater management system that <br />combines drainage wells with exfiltration trenches along with retention areas and water/sewer services. <br />j. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Maurice Gibb Memorial Park, Miami Beach, Florida Maurice Gibb Memorial Park, Miami Beach, Florida Maurice Gibb Memorial Park, Miami Beach, Florida Maurice Gibb Memorial Park, Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Present N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Design, planning, permitting of 2-acre waterfront park. Design elements include living shoreline, seawall, overwater viewing <br />platform and MONSTRUM playground. Led public workshops in coordination with City. <br /> <br />k. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Miracle Mile & Giralda Avenue Streetscape, Coral Gables, Miracle Mile & Giralda Avenue Streetscape, Coral Gables, Miracle Mile & Giralda Avenue Streetscape, Coral Gables, Miracle Mile & Giralda Avenue Streetscape, Coral Gables, <br />FloridaFloridaFloridaFlorida <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2019 2018 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Civil engineering, stormwater management and permitting services for 11.5 acres of streetscape in downtown Coral Gables. <br />l. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />North Beach Recreational Corridor (NBRC) North Beach Recreational Corridor (NBRC) North Beach Recreational Corridor (NBRC) North Beach Recreational Corridor (NBRC) –––– Miami BeachMiami BeachMiami BeachMiami Beach, , , , <br />Florida Florida Florida Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2009 2009 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Manager, Site/Civil engineering services include paving and grading for 6,700 LF of a $6M multi-purpose public <br />access corridor to traverse along the western edge of the beach dunes between 64th Street and 79th Street. Design includes <br />dune enhancements, landscaping, electrical and water service for irrigation. <br />m. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Rickenbacker Causeway North Hobie Beach, MiamiRickenbacker Causeway North Hobie Beach, MiamiRickenbacker Causeway North Hobie Beach, MiamiRickenbacker Causeway North Hobie Beach, Miami----Dade Dade Dade Dade <br />County, FloridaCounty, FloridaCounty, FloridaCounty, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Present N/A <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Civil/coastal design for recreational development involving 9.6 acres of shoreline stabilization and upland facility. New <br />parking lot and roadway and excavation/fill activities, stormwater improvements, sheet pile installation, retaining walls, <br />beach access, revetment and jetties. <br />n. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />South Pointe Park, Miami Beach, FloridaSouth Pointe Park, Miami Beach, FloridaSouth Pointe Park, Miami Beach, FloridaSouth Pointe Park, Miami Beach, Florida <br /> <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2009 2009 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Civil design and coastal/environmental permitting of a multi-purpose recreational park area for structural, hardscape, and <br />landscape improvements in excess of 16 acres. Activities include the construction of a main park structure with <br />offices/concession/restrooms, a storage facility for park vehicles, a raised serpentine walkway, and playground facilities. <br />Page 28